Hi all,
I seem to be suffering from a side effect to Allow duplicates = no and the
Cancel [Queued | Lower Level] duplicates settings.
I make full / differential backups to disk in the weekend, and copy those to
tape for off-site storage on Monday.
There's only one copy job definition with its
This approach can help too: besides doing them in parallel (limited to 5
concurrent jobs because ultimately it all winds up on the same disks), I also
divided them into 4 groups.
From the 1st to 4th Friday night each month, a full backup is done of one group
and differential of the other three.
Sorry, posted the wrong pool definition, and that's why Maximum Concurrent Jobs
was set to 5 instead of 1.
The right one:
Pool {
Name = Tape
Pool Type = Backup
Recycle = yes
AutoPrune = yes
Volume Retention = 3 months
File Retention = 3 months
On May 4, 2015, at 4:14 AM, Luc Van der Veken luc...@wimionline.com wrote:
This approach can help too: besides doing them in parallel (limited to 5
concurrent jobs because ultimately it all winds up on the same disks), I also
divided them into 4 groups.
From the 1st to 4th Friday night
On 5/4/2015 10:02 AM, Dan Langille wrote:
On May 4, 2015, at 4:14 AM, Luc Van der Veken luc...@wimionline.com wrote:
This approach can help too: besides doing them in parallel (limited to 5
concurrent jobs because ultimately it all winds up on the same disks), I also
divided them into 4
On May 4, 2015, at 10:57 AM, Josh Fisher jfis...@pvct.com wrote:
On 5/4/2015 10:02 AM, Dan Langille wrote:
On May 4, 2015, at 4:14 AM, Luc Van der Veken luc...@wimionline.com
mailto:luc...@wimionline.com wrote:
This approach can help too: besides doing them in parallel (limited to 5