Thank you for the explanation. In the status output from the storage
device I could see the despool_wait.
@Patti: Thank you also for your very good explanation.
Best Regards,
- Jummo
On Sat, 11 Aug 2012, Alan Brown wrote:
On 09/08/12 09:27, Jummo wrote:
During the backup one copy job
On 09/08/12 09:27, Jummo wrote:
During the backup one copy job already run and use the first tape drive.
In the output I can see that 4 Jobs runs concurrently (one was the copy
job). A little bit later I noticed that 2 jobs despooling data at the same
time. Will this means the jobs are mixed
Hi,
One more question about Data Spooling and Concurrent Jobs.
I have one autochanger with two tape drives. I have set Maximum Concurrent
Jobs in the Director Resource to 4, the Maximum Concurrent Jobs in the
Storage Resource of the bacula-dir configuration is set to 4. I schedule
about 30
On Thu, Aug 9, 2012 at 4:27 AM, Jummo ju...@devio.us wrote:
Hi,
One more question about Data Spooling and Concurrent Jobs.
I have one autochanger with two tape drives. I have set Maximum Concurrent
Jobs in the Director Resource to 4, the Maximum Concurrent Jobs in the
Storage Resource of
On Thu, 9 Aug 2012, John Drescher wrote:
During the backup one copy job already run and use the first tape drive.
In the output I can see that 4 Jobs runs concurrently (one was the copy
job). A little bit later I noticed that 2 jobs despooling data at the same
time. Will this means the jobs
On Thu, Aug 9, 2012 at 8:05 AM, Jummo ju...@devio.us wrote:
On Thu, 9 Aug 2012, John Drescher wrote:
During the backup one copy job already run and use the first tape drive.
In the output I can see that 4 Jobs runs concurrently (one was the copy
job). A little bit later I noticed that 2
On Thu, Aug 9, 2012 at 8:05 AM, Jummo ju...@devio.us wrote:
On Thu, 9 Aug 2012, John Drescher wrote:
During the backup one copy job already run and use the first tape drive.
In the output I can see that 4 Jobs runs concurrently (one was the copy
job). A little bit later I noticed that 2
On 8/9/12 8:28 AM, John Drescher dresche...@gmail.com wrote:
On Thu, Aug 9, 2012 at 8:05 AM, Jummo ju...@devio.us wrote:
On Thu, 9 Aug 2012, John Drescher wrote:
During the backup one copy job already run and use the first tape
drive.
In the output I can see that 4 Jobs runs concurrently
Hi Patti,
On Thu, 9 Aug 2012, Clark, Patricia A. wrote:
I have had multiple jobs assigned to the same tape drive. If there is
space and none of the thresholds have been reached, the spooling jobs do
continue their spooling. If a job B is ready to despool to tape and job A
is despooling,
On 8/9/12 10:18 AM, Jummo ju...@devio.us wrote:
Hi Patti,
On Thu, 9 Aug 2012, Clark, Patricia A. wrote:
I have had multiple jobs assigned to the same tape drive. If there is
space and none of the thresholds have been reached, the spooling jobs do
continue their spooling. If a job B is