On Sun, 25 Feb 2007, Erik P. Olsen wrote:
Is there a way to automatically skip the back-up job if there is no route to
host? At the moment the failing back-up job is retried 6 times before it is
ended. Therefore the resources are blocked for half an hour which which is
highly undesirable.
We take back-ups every night at 2 o'clock of a series of boxes of which some may
not be at the office at that time because they are out in the field (notebooks).
Is there a way to automatically skip the back-up job if there is no route to
host? At the moment the failing back-up job is retried 6