FWIW,
we have a dependency to m2e runtime.
With m2e’s move to 1.5 and switching from Sonatype Aether to Eclipse Aether
Incubation we have a similar issue.
We can fall back to the 1.4 maven runtime, though.
A release of Eclipse Aether (this component contains 98% of what we need) would
help -
On 15/12/2013 11:06 PM, Igor Fedorenko wrote:
Problem is, maven 3.1.x includes Eclipse Aether and
Eclipse Sisu binaries, both currently under incubation as eclipse
technology project.
What I don't understand is that if these projects are mature enough to
be included in production versions of
Hi,
m2e-wtp would like to participate in the Luna Simultaneous release:
https://projects.eclipse.org/projects/technology.m2e.m2e-wtp/releases/1.1.0
m2e-wtp is a +3 contribution
This declaration on intent is based on the assumption m2e will make it to
Luna (
Hi,
The EEF Project (Extended Editing Framework) will participate in the
Luna Simultaneous Release :
http://projects.eclipse.org/projects/modeling.emft.eef/releases/1.4.0.
EEF is a +2 contribution.
Cheers,
Nathalie Lepine
___
The RSE component of TM was relying on some internal platform classes that were
recently removed. This is causing build problems, so TM may be late for M4.
Please see https://bugs.eclipse.org/bugs/show_bug.cgi?id=422844 for details.
Regards,
Greg
___
On Mon, Dec 16, 2013 at 1:17 PM, Igor Fedorenko i...@ifedorenko.com wrote:
On 12/16/2013, 4:16, Mike Milinkovich wrote:
On 15/12/2013 11:06 PM, Igor Fedorenko wrote:
Problem is, maven 3.1.x includes Eclipse Aether and
Eclipse Sisu binaries, both currently under incubation as eclipse
Wasn't there another deadline in February for new CQ submissions?
--
Regards,
Igor
On 12/16/2013, 9:36, Matthias Sohn wrote:
On Mon, Dec 16, 2013 at 1:17 PM, Igor Fedorenko i...@ifedorenko.com
mailto:i...@ifedorenko.com wrote:
On 12/16/2013, 4:16, Mike Milinkovich wrote:
On
On 16/12/2013 9:39 AM, Igor Fedorenko wrote:
Wasn't there another deadline in February for new CQ submissions?
I _think_ that's for new dependencies, not a new version of an existing
dependency. But Wayne or Janet are the experts.
--
Mike Milinkovich
mike.milinkov...@eclipse.org
It has come to my attention that some bundles in eclipse appear to be using
interim headers and attributes that never made it into a final OSGi
specification. For Luna the Equinox framework no longer supports these
interim headers [1]. This seemed like a relatively safe change since we
assumed
The submission deadline is the deadline for all CQs. The May
deadline was for IP log submission.
I agree that if Sisu and Aether have both been adopted by a release
version of Maven, that this is a pretty clear indication that they
are mature technology.
Hi Team,
GMF Notation will participate in the Luna Simultaneous release:
https://projects.eclipse.org/projects/modeling.gmp.gmf-notation/releases/1.8.0
GMF Notation is a +2 contribution
Cheers...
Anthony
___
cross-project-issues-dev mailing list
I cannot speak for them but m2e is included in my RCP/RAP package, too. I
don't like the idea of having to use an Incubation label on my package,
and I am sure that the Java and Java EE package maintainers have a similar
opinion.
Thanks,
Markus
On Mon, Dec 16, 2013 at 7:13 PM, Igor Fedorenko
What is your suggestion?
BTW, I didn't even realize m2e was part of RCP/RAP package :-)
--
Regards,
Igor
On 12/16/2013, 13:16, Markus Knauer wrote:
I cannot speak for them but m2e is included in my RCP/RAP package, too.
I don't like the idea of having to use an Incubation label on my
package,
On 16 Dec 2013, at 17:45, Wayne Beaton wa...@eclipse.org wrote:
Have the Sisu and Aether projects been contacted regarding graduation? I'd
love to hear their opinion regarding their readiness.
The plan was to make two further releases of Sisu from the incubator before
requesting to graduate
I don't have *the* solution at hand, but Wayne's and others idea of
graduating these projects seems to be the best way to move forward - given
that a graduation is possible. Both projects are included in another
project (m2e) and this is one sign of maturity.
The IP deadline needs to be discussed
This has been failing a for long time (since this morning) ... are you
actively working on a fix? Waiting for someone else?
Might be good to disable it, for now, if you think it will take much
longer and/or keep everyone informed on cross-project list.
Thanks,
From: David M
16 matches
Mail list logo