Re: [cross-project-issues-dev] Status and outlook near end of M4 +3

2011-12-15 Thread Bob Brodt
But...I had already done that (open the release tracker, set the offset and a bunch of other fields, and clicked the "track with parent" link) yesterday.Any idea why soa.bpel wasn't showing up? Okay, I sorted it out. Flipping the bit--it turns out--isn't enough.

Re: [cross-project-issues-dev] Status and outlook near end of M4 +3

2011-12-14 Thread Bob Brodt
Yes, I'm not here raises hand I don't think BPEL will be in the aggregation build by tonight. When is M5? Robert (Bob) Brodt Senior Software Engineer JBoss by Red Hat - Original Message - Roll call ... I think the last aggregation build got all the latest

Re: [cross-project-issues-dev] Status and outlook near end of M4 +3

2011-12-14 Thread Wayne Beaton
AFAICT, BPEL has not yet flipped the bit for Juno. Can you please do that? The calendar and other resources are accessible from the wiki http://wiki.eclipse.org/Juno Thanks, Wayne On 12/14/2011 06:13 PM, Bob Brodt wrote: Yes, I'm not

Re: [cross-project-issues-dev] Status and outlook near end of M4 +3

2011-12-14 Thread David M Williams
as an exception and you join in M5. From: Bob Brodt bbr...@redhat.com To: Cross project issues cross-project-issues-dev@eclipse.org, Date: 12/14/2011 06:14 PM Subject:Re: [cross-project-issues-dev] Status and outlook near end of M4 +3 Sent by:cross-project

Re: [cross-project-issues-dev] Status and outlook near end of M4 +3

2011-12-14 Thread Wayne Beaton
It looks like it should work. I am investigating. Wayne On 12/14/2011 07:18 PM, Bob Brodt wrote: Argh, one more try: Yes, I have read this wiki...but I'm still confused. Here's the portal page

Re: [cross-project-issues-dev] Status and outlook near end of M4 +3

2011-12-14 Thread Wayne Beaton
Okay, I sorted it out. Flipping the bit--it turns out--isn't enough. After flipping the bit, projects will have to open the "Simultaneous Release Tracker" component and set any of the values. I recommend setting the offset. If your project is