Re: 11.1 and 10.11 planning]

2021-09-16 Thread Steve McIntyre
Forwarding to the lists Andy forgot... - Forwarded message from Andy Simpkins - From: Andy Simpkins To: debian-cd@lists.debian.org Date: Wed, 15 Sep 2021 20:53:41 +0100 Subject: Re: 11.1 and 10.11 planning Message-ID: <717ba215-4bcc-08ab-b087-8f781f15c...@koipond.org.uk> On 14/0

Re: 11.1 and 10.11 planning

2021-09-15 Thread Cyril Brulebois
Hi, Andy Simpkins (2021-09-15): > given that Steve will be around I am happy for both in one day :-) If that was meant as a reply to everyone rather than an internal confirmation on debian-cd@, maybe send the same mail via reply-all? :) Cheers, -- Cyril Brulebois (k...@debian.org)

Re: 11.1 and 10.11 planning

2021-09-15 Thread Andy Simpkins
On 14/09/2021 20:14, Steve McIntyre wrote: On Tue, Sep 14, 2021 at 07:04:11PM +0100, Adam Barratt wrote: Hi, Thanks for the responses everyone. Mark indicated on IRC that he'd be happy to be ftpmaster-du-jour on any of the dates. On Mon, 2021-09-06 at 12:51 +0100, Adam D. Barratt wrote:

Re: 11.1 and 10.11 planning

2021-09-14 Thread Steve McIntyre
On Tue, Sep 14, 2021 at 07:04:11PM +0100, Adam Barratt wrote: >Hi, > >Thanks for the responses everyone. Mark indicated on IRC that he'd be >happy to be ftpmaster-du-jour on any of the dates. > >On Mon, 2021-09-06 at 12:51 +0100, Adam D. Barratt wrote: >> We've ended up being late with planning

Re: 11.1 and 10.11 planning

2021-09-14 Thread Adam D. Barratt
Hi, Thanks for the responses everyone. Mark indicated on IRC that he'd be happy to be ftpmaster-du-jour on any of the dates. On Mon, 2021-09-06 at 12:51 +0100, Adam D. Barratt wrote: > We've ended up being late with planning 10.11 due to the timing of > the bullseye release, and also need to

Re: 11.1 and 10.11 planning

2021-09-10 Thread Laura Arjona Reina
Sorry for the delay El 6 de septiembre de 2021 13:58:14 CEST, Cyril Brulebois escribió: >Hi Adam, > >Adam D. Barratt (2021-09-06): >> We've ended up being late with planning 10.11 due to the timing of the >> bullseye release, and also need to look at getting 11.1 sorted. >> >> Traditionally,

Re: 11.1 and 10.11 planning

2021-09-06 Thread Andy Simpkins
On 06/09/2021 12:58, Cyril Brulebois wrote: Hi Adam, Adam D. Barratt (2021-09-06): We've ended up being late with planning 10.11 due to the timing of the bullseye release, and also need to look at getting 11.1 sorted. Traditionally, we've combined stable and oldstable point releases (at 2-

Re: 11.1 and 10.11 planning

2021-09-06 Thread Steve McIntyre
On Mon, Sep 06, 2021 at 12:51:07PM +0100, Adam Barratt wrote: >Hi, > >We've ended up being late with planning 10.11 due to the timing of the >bullseye release, and also need to look at getting 11.1 sorted. > >Traditionally, we've combined stable and oldstable point releases (at >2- and 4-month

Re: 11.1 and 10.11 planning

2021-09-06 Thread Cyril Brulebois
Hi Adam, Adam D. Barratt (2021-09-06): > We've ended up being late with planning 10.11 due to the timing of the > bullseye release, and also need to look at getting 11.1 sorted. > > Traditionally, we've combined stable and oldstable point releases (at > 2- and 4-month cadences) while both are

11.1 and 10.11 planning

2021-09-06 Thread Adam D. Barratt
Hi, We've ended up being late with planning 10.11 due to the timing of the bullseye release, and also need to look at getting 11.1 sorted. Traditionally, we've combined stable and oldstable point releases (at 2- and 4-month cadences) while both are supported. That would still be my preference,