Re: stretch EOL point release (9.13) and 10.5 planning

2020-07-19 Thread Donald Norwood
Hi,

On 7/18/20 5:44 PM, Andy Simpkins wrote:
> 
> 
> On 18 July 2020 22:39:05 BST, Steve McIntyre  wrote:
> 
> On Sat, Jul 18, 2020 at 10:12:41PM +0100, Adam Barratt wrote:
> 
> On Sun, 2020-07-12 at 15:35 +0100, Adam D. Barratt wrote:
> 
> Hi Steve,
> 
> On Sun, 2020-07-12 at 12:46 +0100, Steve McIntyre wrote:
> 
> Argh, massive apologies...
> 
> On Thu, Jun 25, 2020 at 10:38:14AM +0200, Laura Arjona
> Reina wrote:
> 
> El 15/6/20 a las 18:44, Adam D. Barratt escribió:
> 
> - July 18/19
> 
> 
> Massive apologies for dropping a spanner in the works, but
> something major has come up. I won't be able to do *all*
> of that
> weekend after all. As Stretch EOL is already a thing,
> can I suggest
> that we keep that to plan and push back the Buster 10.5
> release a
> little?
> 
> Sorry. :-/
> 
> 
> Thanks for letting us know. :-(
> 
> I'll drop a note to the lists, and we can look at getting a
> new date
> organised.
> 
> 
> Now that stretch EoL is (more or less) out of the way, it would
> be good
> to get 10.5 done as soon as we sensibly can, so as not to slip
> too far
> off schedule.
> 
> Next weekend is probably a little too soon - I'd at least like
> to not
> jump straight back into freezing - but how about one of:
> 
> - August 1st/2nd
> - August 8th/9th
> 
> 
> Either is possible for me, with a preference for the first. Let's not
> delay too long if possible.
> 
> Cheers,
> 
> Steve
> 
> 
> -- 
> I am good for either weekend.
> Given a preferance i would prefer the 1st.
> 
> Cheers
> /Andy

August 1/2nd is good on the publicity side. 8/9 can work if needed.

-- 
--
⢀⣴⠾⠻⢶⣦⠀
⣾⠁⢠⠒⠀⣿⡁ Donald Norwood
⢿⡄⠘⠷⠚⠋⠀ B7A1 5F45 5B28 7F38 4174
⠈⠳⣄ D5E9 E5EC 4AC9 BD62 7B05



signature.asc
Description: OpenPGP digital signature


Re: stretch EOL point release (9.13) and 10.5 planning

2020-07-19 Thread Mark Hymers
On Sat, 18, Jul, 2020 at 10:12:41PM +0100, Adam D. Barratt spoke thus..
> Next weekend is probably a little too soon - I'd at least like to not
> jump straight back into freezing - but how about one of:
> 
> - August 1st/2nd

Hu,

1st is definitely better for me than the 8th for ftp-side.

Thanks,

Mark

-- 
Mark Hymers 



Re: stretch EOL point release (9.13) and 10.5 planning

2020-07-18 Thread Andy Simpkins


On 18 July 2020 22:39:05 BST, Steve McIntyre  wrote:
>On Sat, Jul 18, 2020 at 10:12:41PM +0100, Adam Barratt wrote:
>>On Sun, 2020-07-12 at 15:35 +0100, Adam D. Barratt wrote:
>>> Hi Steve,
>>> 
>>> On Sun, 2020-07-12 at 12:46 +0100, Steve McIntyre wrote:
>>> > Argh, massive apologies...
>>> > 
>>> > On Thu, Jun 25, 2020 at 10:38:14AM +0200, Laura Arjona Reina
>wrote:
>>> > > El 15/6/20 a las 18:44, Adam D. Barratt escribió:
>>> > > > - July 18/19
>>> > 
>>> > Massive apologies for dropping a spanner in the works, but
>>> > something major has come up. I won't be able to do *all* of that
>>> > weekend after all. As Stretch EOL is already a thing, can I
>suggest
>>> > that we keep that to plan and push back the Buster 10.5 release a
>>> > little?
>>> > 
>>> > Sorry. :-/
>>> 
>>> Thanks for letting us know. :-(
>>> 
>>> I'll drop a note to the lists, and we can look at getting a new date
>>> organised.
>>
>>Now that stretch EoL is (more or less) out of the way, it would be
>good
>>to get 10.5 done as soon as we sensibly can, so as not to slip too far
>>off schedule.
>>
>>Next weekend is probably a little too soon - I'd at least like to not
>>jump straight back into freezing - but how about one of:
>>
>>- August 1st/2nd
>>- August 8th/9th
>
>Either is possible for me, with a preference for the first. Let's not
>delay too long if possible.
>
>Cheers,
>
>Steve
>
>-- 
>Steve McIntyre, Cambridge, UK.   
>st...@einval.com
>  Armed with "Valor": "Centurion" represents quality of Discipline,
>  Honor, Integrity and Loyalty. Now you don't have to be a Caesar to
>  concord the digital world while feeling safe and proud.

-- 
I am good for either weekend.
Given a preferance i would prefer the 1st.  

Cheers
/Andy
Sent from my Android device with K-9 Mail. Please excuse my brevity.

Re: stretch EOL point release (9.13) and 10.5 planning

2020-07-18 Thread Steve McIntyre
On Sat, Jul 18, 2020 at 10:12:41PM +0100, Adam Barratt wrote:
>On Sun, 2020-07-12 at 15:35 +0100, Adam D. Barratt wrote:
>> Hi Steve,
>> 
>> On Sun, 2020-07-12 at 12:46 +0100, Steve McIntyre wrote:
>> > Argh, massive apologies...
>> > 
>> > On Thu, Jun 25, 2020 at 10:38:14AM +0200, Laura Arjona Reina wrote:
>> > > El 15/6/20 a las 18:44, Adam D. Barratt escribió:
>> > > > - July 18/19
>> > 
>> > Massive apologies for dropping a spanner in the works, but
>> > something major has come up. I won't be able to do *all* of that
>> > weekend after all. As Stretch EOL is already a thing, can I suggest
>> > that we keep that to plan and push back the Buster 10.5 release a
>> > little?
>> > 
>> > Sorry. :-/
>> 
>> Thanks for letting us know. :-(
>> 
>> I'll drop a note to the lists, and we can look at getting a new date
>> organised.
>
>Now that stretch EoL is (more or less) out of the way, it would be good
>to get 10.5 done as soon as we sensibly can, so as not to slip too far
>off schedule.
>
>Next weekend is probably a little too soon - I'd at least like to not
>jump straight back into freezing - but how about one of:
>
>- August 1st/2nd
>- August 8th/9th

Either is possible for me, with a preference for the first. Let's not
delay too long if possible.

Cheers,

Steve

-- 
Steve McIntyre, Cambridge, UK.st...@einval.com
  Armed with "Valor": "Centurion" represents quality of Discipline,
  Honor, Integrity and Loyalty. Now you don't have to be a Caesar to
  concord the digital world while feeling safe and proud.



Re: stretch EOL point release (9.13) and 10.5 planning

2020-07-18 Thread Cyril Brulebois
Adam D. Barratt  (2020-07-18):
> Now that stretch EoL is (more or less) out of the way, it would be good
> to get 10.5 done as soon as we sensibly can, so as not to slip too far
> off schedule.
> 
> Next weekend is probably a little too soon - I'd at least like to not
> jump straight back into freezing - but how about one of:
> 
> - August 1st/2nd
> - August 8th/9th

Both should work equally for me regarding the installer.


Cheers,
-- 
Cyril Brulebois (k...@debian.org)
D-I release manager -- Release team member -- Freelance Consultant


signature.asc
Description: PGP signature


Re: stretch EOL point release (9.13) and 10.5 planning

2020-07-18 Thread Adam D. Barratt
On Sun, 2020-07-12 at 15:35 +0100, Adam D. Barratt wrote:
> Hi Steve,
> 
> On Sun, 2020-07-12 at 12:46 +0100, Steve McIntyre wrote:
> > Argh, massive apologies...
> > 
> > On Thu, Jun 25, 2020 at 10:38:14AM +0200, Laura Arjona Reina wrote:
> > > El 15/6/20 a las 18:44, Adam D. Barratt escribió:
> > > > - July 18/19
> > 
> > Massive apologies for dropping a spanner in the works, but
> > something major has come up. I won't be able to do *all* of that
> > weekend after all. As Stretch EOL is already a thing, can I suggest
> > that we keep that to plan and push back the Buster 10.5 release a
> > little?
> > 
> > Sorry. :-/
> 
> Thanks for letting us know. :-(
> 
> I'll drop a note to the lists, and we can look at getting a new date
> organised.

Now that stretch EoL is (more or less) out of the way, it would be good
to get 10.5 done as soon as we sensibly can, so as not to slip too far
off schedule.

Next weekend is probably a little too soon - I'd at least like to not
jump straight back into freezing - but how about one of:

- August 1st/2nd
- August 8th/9th

Regards,

Adam



Re: stretch EOL point release (9.13) and 10.5 planning

2020-07-12 Thread Adam D. Barratt
Hi Steve,

On Sun, 2020-07-12 at 12:46 +0100, Steve McIntyre wrote:
> Argh, massive apologies...
> 
> On Thu, Jun 25, 2020 at 10:38:14AM +0200, Laura Arjona Reina wrote:
> > El 15/6/20 a las 18:44, Adam D. Barratt escribió:
> > > - July 18/19
> 
> Massive apologies for dropping a spanner in the works, but something
> major has come up. I won't be able to do *all* of that weekend after
> all. As Stretch EOL is already a thing, can I suggest that we keep
> that to plan and push back the Buster 10.5 release a little?
> 
> Sorry. :-/

Thanks for letting us know. :-(

I'll drop a note to the lists, and we can look at getting a new date
organised.

Regards,

Adam



Re: stretch EOL point release (9.13) and 10.5 planning

2020-07-12 Thread Steve McIntyre
Argh, massive apologies...

On Thu, Jun 25, 2020 at 10:38:14AM +0200, Laura Arjona Reina wrote:
>El 15/6/20 a las 18:44, Adam D. Barratt escribió:
>>
>> - July 18/19

Massive apologies for dropping a spanner in the works, but something
major has come up. I won't be able to do *all* of that weekend after
all. As Stretch EOL is already a thing, can I suggest that we keep
that to plan and push back the Buster 10.5 release a little?

Sorry. :-/

-- 
Steve McIntyre, Cambridge, UK.st...@einval.com
Who needs computer imagery when you've got Brian Blessed?



Re: stretch EOL point release (9.13) and 10.5 planning

2020-06-25 Thread Laura Arjona Reina
Hi

El 15/6/20 a las 18:44, Adam D. Barratt escribió:
> Hi,
> 
> stretch transitions from oldstable-with-security-support to LTS support
> on Saturday July 4th. As usual, we should aim for the final point
> release to be soon after that, most likely pulling in any remaining
> updates from security.d.o that are still in oldstable-new.
> 
> I think Saturday July 11th makes most sense (so freezing opu during the
> transition weekend), but we could potentially stretch (no pun intended)
> slightly further if need be.
> 
> We also need to look at the next buster point release in a similar
> timeframe. Can anyone see a reason not to do the two at the same time,
> as usual?
> 
> To get the ball rolling, please could you confirm your availability
> for:
> 
> - July 11/12
> - July 18/19
> 
Sorry for the late reply.
We had talk about this but forgot to send the mail.
Any of the proposed dates is workable for press/website.

Apologies again for the delay.
Kind regards,
-- 
Laura Arjona Reina
https://wiki.debian.org/LauraArjona



Re: stretch EOL point release (9.13) and 10.5 planning

2020-06-16 Thread Mark Hymers
On Mon, 15, Jun, 2020 at 05:44:54PM +0100, Adam D. Barratt spoke thus..
> - July 11/12
> - July 18/19

I'm happy to do either of these for ftp.

Thanks,

Mark

-- 
Mark Hymers 


signature.asc
Description: PGP signature


Re: stretch EOL point release (9.13) and 10.5 planning

2020-06-15 Thread Andy Simpkins
On 15/06/20 19:05, Cyril Brulebois wrote:
> Hi,
> 
> Adam D. Barratt  (2020-06-15):
>> To get the ball rolling, please could you confirm your availability
>> for:
>>
>> - July 11/12
>> - July 18/19
> 
> 
> Anyway, I should be available, whatever date(s) get picked.
> 
Preferance would be the weekend of the 18/19 for Isy and me (we have
plans for the weekend before).

/Andy




signature.asc
Description: OpenPGP digital signature


Re: stretch EOL point release (9.13) and 10.5 planning

2020-06-15 Thread Cyril Brulebois
Hi,

Adam D. Barratt  (2020-06-15):
> stretch transitions from oldstable-with-security-support to LTS support
> on Saturday July 4th. As usual, we should aim for the final point
> release to be soon after that, most likely pulling in any remaining
> updates from security.d.o that are still in oldstable-new.
> 
> I think Saturday July 11th makes most sense (so freezing opu during the
> transition weekend), but we could potentially stretch (no pun intended)
> slightly further if need be.
> 
> We also need to look at the next buster point release in a similar
> timeframe. Can anyone see a reason not to do the two at the same time,
> as usual?
> 
> To get the ball rolling, please could you confirm your availability
> for:
> 
> - July 11/12
> - July 18/19

Haven't looked at stretch in a while from a d-i point of view, but I
don't think we have any bugfixes pending? I'll have to check what's
happening on the buster front, if anything.

Anyway, I should be available, whatever date(s) get picked.


Cheers,
-- 
Cyril Brulebois (k...@debian.org)
D-I release manager -- Release team member -- Freelance Consultant


signature.asc
Description: PGP signature


Re: stretch EOL point release (9.13) and 10.5 planning

2020-06-15 Thread Steve McIntyre
Hey Adam,

On Mon, Jun 15, 2020 at 05:44:54PM +0100, Adam Barratt wrote:
>Hi,
>
>stretch transitions from oldstable-with-security-support to LTS support
>on Saturday July 4th. As usual, we should aim for the final point
>release to be soon after that, most likely pulling in any remaining
>updates from security.d.o that are still in oldstable-new.
>
>I think Saturday July 11th makes most sense (so freezing opu during the
>transition weekend), but we could potentially stretch (no pun intended)
>slightly further if need be.
>
>We also need to look at the next buster point release in a similar
>timeframe. Can anyone see a reason not to do the two at the same time,
>as usual?

Should be fine for the images team.

>To get the ball rolling, please could you confirm your availability
>for:
>
>- July 11/12
>- July 18/19

Either is possible for me, with a slight preference for the second
weekend.

-- 
Steve McIntyre, Cambridge, UK.st...@einval.com
"Because heaters aren't purple!" -- Catherine Pitt