Re: Scheduling 9.2

2017-09-23 Thread Jonathan Wiltshire
On Fri, Sep 22, 2017 at 02:35:32PM +0800, Cédric Boutillier wrote: > Hi, > > Le 18 septembre 2017 00:25:55 GMT+08:00, "Adam D. Barratt" > a écrit : > > > > >That currently looks okay for me too. > > > >If we're going for that weekend then it would be good to be able

Re: Scheduling 9.2

2017-09-22 Thread Cédric Boutillier
Hi, Le 18 septembre 2017 00:25:55 GMT+08:00, "Adam D. Barratt" a écrit : > >That currently looks okay for me too. > >If we're going for that weekend then it would be good to be able to >announce as soon as feasible, as it would mean freezing p-u in two >weekends time.

Re: Scheduling 9.2

2017-09-19 Thread Ansgar Burchardt
Jonathan Wiltshire writes: > Ok, does 7th October work any better? I'm keen not to get too far adrift > from the interval though. Should be okay if no other ftpmaster volunteers. Ansgar

Re: Scheduling 9.2

2017-09-17 Thread Adam D. Barratt
On Sun, 2017-09-17 at 15:31 +0100, Steve McIntyre wrote: > On Sun, Sep 17, 2017 at 03:20:05PM +0100, Jonathan Wiltshire wrote: > > On Mon, Aug 28, 2017 at 09:31:22PM +0100, Steve McIntyre wrote: > > > On Sun, Aug 27, 2017 at 04:48:14PM +0100, Jonathan Wiltshire > > > wrote: > > > > Hi, > > > > >

Re: Scheduling 9.2

2017-09-17 Thread Steve McIntyre
On Sun, Sep 17, 2017 at 03:20:05PM +0100, Jonathan Wiltshire wrote: >On Mon, Aug 28, 2017 at 09:31:22PM +0100, Steve McIntyre wrote: >> On Sun, Aug 27, 2017 at 04:48:14PM +0100, Jonathan Wiltshire wrote: >> >Hi, >> > >> >I'm working on dates for 9.2; by a two month cycle we're aiming for around >>

Re: Scheduling 9.2

2017-09-17 Thread Jonathan Wiltshire
On Mon, Aug 28, 2017 at 09:31:22PM +0100, Steve McIntyre wrote: > On Sun, Aug 27, 2017 at 04:48:14PM +0100, Jonathan Wiltshire wrote: > >Hi, > > > >I'm working on dates for 9.2; by a two month cycle we're aiming for around > >23rd September. How about one of: > > > >23rd/24th September > >30th

Re: Scheduling 9.2

2017-09-11 Thread Laura Arjona Reina
Hello El 27/08/17 a las 17:48, Jonathan Wiltshire escribió: > Hi, > > I'm working on dates for 9.2; by a two month cycle we're aiming for around > 23rd September. How about one of: > > 23rd/24th September > 30th Septmber/1st October > > [SRMs: needs one of you too please :) ] > > After

Re: Scheduling 9.2

2017-09-06 Thread Adam D. Barratt
On Sun, 2017-08-27 at 16:48 +0100, Jonathan Wiltshire wrote: > I'm working on dates for 9.2; by a two month cycle we're aiming for > around 23rd September. How about one of: > > 23rd/24th September > 30th Septmber/1st October > > [SRMs: needs one of you too please :) ] I'd prefer to avoid the

Re: Scheduling 9.2

2017-08-28 Thread Steve McIntyre
On Sun, Aug 27, 2017 at 04:48:14PM +0100, Jonathan Wiltshire wrote: >Hi, > >I'm working on dates for 9.2; by a two month cycle we're aiming for around >23rd September. How about one of: > >23rd/24th September >30th Septmber/1st October I'm out in San Francisco for the week ib between them. I

Scheduling 9.2

2017-08-27 Thread Jonathan Wiltshire
Hi, I'm working on dates for 9.2; by a two month cycle we're aiming for around 23rd September. How about one of: 23rd/24th September 30th Septmber/1st October [SRMs: needs one of you too please :) ] After discussion with Adam and Steve, we felt it made sense to work on 2 months for stable and