Re: Upcoming Lenny Point Release

2009-06-23 Thread Adam D. Barratt
Luk Claes wrote: Unfortunately I won't be available the next couple of days and Phil was rather busy up to now (and I expect that to continue for some time still), so the point release will be delayed for at least a week. Hopefully we will be able to do the point release next Saturday, I hope

Re: Upcoming Lenny point release

2009-09-04 Thread Adam D. Barratt
Adam D. Barratt wrote: The next Lenny point release (5.0.3) is scheduled for Saturday, September 5th. The point release has now been moved slightly forward - we'll be aiming to start around 19:00 UTC this evening so the updated packages should start appearing on mirrors overnight (UTC

Upcoming lenny point release

2010-01-17 Thread Adam D. Barratt
Hi, The next Lenny point release (5.0.4) is scheduled for the evening of Friday, January 29th. Stable NEW will be frozen during the weekend of January 23rd - 24th. Regards, Adam -- To UNSUBSCRIBE, email to debian-cd-requ...@lists.debian.org with a subject of unsubscribe. Trouble? Contact

Upcoming etch point release

2010-05-13 Thread Adam D. Barratt
Hi, The next point release for the etch oldstable distribution, 4.0r9, is scheduled for Saturday, 22nd May. This will be the final point release for etch, which will be moved to archive.debian.org in the near future. Regards, Adam -- To UNSUBSCRIBE, email to

Upcoming Lenny point release

2010-06-16 Thread Adam D. Barratt
Hi, The next Lenny point release (5.0.5) is scheduled for Saturday, June 26th. Stable NEW will be frozen during the weekend of June 19th - 20th. Regards, Adam -- To UNSUBSCRIBE, email to debian-cd-requ...@lists.debian.org with a subject of unsubscribe. Trouble? Contact

Upcoming lenny point release

2010-08-24 Thread Adam D. Barratt
Hi, The next Lenny point release (5.0.6) is scheduled for Saturday, September 4th. Stable NEW will be frozen during the weekend of August 28th - 29th. Regards, Adam -- To UNSUBSCRIBE, email to debian-cd-requ...@lists.debian.org with a subject of unsubscribe. Trouble? Contact

Re: Some updates not contained on point release DVDs

2010-09-26 Thread Adam D. Barratt
On Sun, 2010-09-26 at 21:12 +0100, Steve McIntyre wrote: On Sun, Sep 26, 2010 at 08:51:50PM +0200, Hilmar Preusse wrote: I noticed that some (security) updates for Debian lenny are available from debian/security for a while, but never made it on an point release DVD image. Examples?

Re: Some updates not contained on point release DVDs

2010-10-09 Thread Adam D. Barratt
On Fri, 2010-10-08 at 19:42 +0200, Hilmar Preusse wrote: On 26.09.10 Adam D. Barratt (a...@adam-barratt.org.uk) wrote: Packages from stable-security only get accepted in to proposed-updates (and therefore into stable) once the packages are available for all architectures [...] So

Re: lack of gnome on squeeze CD #1

2010-12-05 Thread Adam D. Barratt
On Sun, 2010-12-05 at 20:01 +0100, Josselin Mouette wrote: Le dimanche 05 décembre 2010 à 14:02 -0400, Joey Hess a écrit : How should I name the new metapackage? My first thought is just to move these packages from gnome-desktop-environment to gnome-core, and to make gnome-core the key

Upcoming squeeze point release

2011-03-08 Thread Adam D. Barratt
Hi, The first Squeeze point release (6.0.1) is scheduled for Saturday, March 19th. Stable NEW will be frozen during the weekend of the 12/13th. Regards, Adam -- To UNSUBSCRIBE, email to debian-cd-requ...@lists.debian.org with a subject of unsubscribe. Trouble? Contact

Planning for final lenny point release (5.0.10)

2011-12-12 Thread Adam D. Barratt
Hi, Working on the four-monthly schedule for oldstable, the next lenny point release would be due in early February. As the security team have recently confirmed that security support for lenny will end on February 6th (a year after the release of squeeze) it makes sense to schedule 5.0.10 to be

Planning for next squeeze point release (6.0.4)

2011-12-12 Thread Adam D. Barratt
Hi, Yep, it's that time again. Based on a bi-monthly schedule, 6.0.4 would be due around mid-January. We may want to adjust timings a little, so that we don't end up trying to set deadlines for things like kernel and d-i changes being ready over the holiday period. As an opening gambit, I'd

Re: Planning for final lenny point release (5.0.10)

2011-12-13 Thread Adam D. Barratt
On Tue, 2011-12-13 at 21:39 +0100, Joerg Jaspert wrote: On 12693 March 1977, Adam D. Barratt wrote: From the experience of etch's EOL point release, we'll need a little time to sort out any remaining build issues for security packages after the end of support. The earliest we'd therefore

Re: Planning for next squeeze point release (6.0.4)

2012-01-05 Thread Adam D. Barratt
On Thu, 2011-12-15 at 22:41 +0100, Daniel Baumann wrote: On 12/13/2011 12:07 AM, Adam D. Barratt wrote: As an opening gambit, I'd propose we look at one of the following Saturdays in January: 14th, 21st, 28th. 21st and 28th (with the respective day after the actual release day, to do

Re: Planning for next squeeze point release (6.0.4)

2012-01-10 Thread Adam D. Barratt
press@, -live - ping? On Thu, 2012-01-05 at 20:12 +, Adam D. Barratt wrote: On Thu, 2011-12-15 at 22:41 +0100, Daniel Baumann wrote: On 12/13/2011 12:07 AM, Adam D. Barratt wrote: As an opening gambit, I'd propose we look at one of the following Saturdays in January: 14th, 21st, 28th

Re: Planning for final lenny point release (5.0.10)

2012-02-14 Thread Adam D. Barratt
On Mon, 2011-12-12 at 23:05 +, Adam D. Barratt wrote: Working on the four-monthly schedule for oldstable, the next lenny point release would be due in early February. As the security team have recently confirmed that security support for lenny will end on February 6th (a year after

Re: Planning for final lenny point release (5.0.10)

2012-02-28 Thread Adam D. Barratt
On 14.02.2012 21:36, Adam D. Barratt wrote: On Mon, 2011-12-12 at 23:05 +, Adam D. Barratt wrote: As the security team have recently confirmed that security support for lenny will end on February 6th (a year after the release of squeeze) it makes sense to schedule 5.0.10 to be after

Upcoming oldstable point release

2012-02-28 Thread Adam D. Barratt
Hi, The next - and final - point release for lenny (5.0.10) is scheduled for Saturday March 10th. Oldstable NEW will be frozen during the coming weekend (3rd/4th). As this will be the last point release for lenny, it will be moved to archive.debian.org in the near future (most likely on or

Squeeze point release (6.0.5)

2012-04-24 Thread Adam D. Barratt
Hi, 6.0.5 is somewhat overdue now and I've been procrastinating over organising it for a while. So before I find something else to distract myself with, some suggested dates: May 5/6: Probably doable; would mean we need to close p-u-NEW over the coming weekend. May 12/13: York BSP. Probably

Re: Squeeze point release (6.0.5)

2012-04-29 Thread Adam D. Barratt
On Tue, 2012-04-24 at 21:06 +0100, Adam D. Barratt wrote: 6.0.5 is somewhat overdue now and I've been procrastinating over organising it for a while. So before I find something else to distract myself with, some suggested dates: It looks like the discussion has converged towards: May 12/13

Re: [RFH] Release of D-I Alpha1

2012-04-29 Thread Adam D. Barratt
On Mon, 2012-04-23 at 16:31 -0300, Otavio Salvador wrote: To what we had for a1 basically: get CD images built (Steve, yey!); test them finish announce mail mail to to d-d-a if all above work How are things going with that? Regards, Adam -- To UNSUBSCRIBE, email to

Re: [RFH] Release of D-I Alpha1

2012-04-29 Thread Adam D. Barratt
On Sun, 2012-04-29 at 16:54 +0100, Steve McIntyre wrote: On Sun, Apr 29, 2012 at 04:49:40PM +0100, Adam Barratt wrote: On Mon, 2012-04-23 at 16:31 -0300, Otavio Salvador wrote: To what we had for a1 basically: get CD images built (Steve, yey!); test them finish announce mail

Upcoming stable point release (6.0.5)

2012-04-30 Thread Adam D. Barratt
Hi, The next point release for squeeze (6.0.5) is scheduled for Saturday May 12th. Stable NEW will be frozen during the preceding weekend (5/6th). As usual, base-files can be uploaded at any point before the freeze. Regards, Adam -- To UNSUBSCRIBE, email to

Re: [RFH] Release of D-I Alpha1

2012-05-03 Thread Adam D. Barratt
On Sun, 2012-04-29 at 17:36 +0100, Adam D. Barratt wrote: On Sun, 2012-04-29 at 16:54 +0100, Steve McIntyre wrote: I can do an alpha build of CDs whenever they're desired, just let me know when things are looking ready. Ah, I'd somewhat assumed that Otavio's Steve, yey! above meant

Re: [RFH] Release of D-I Alpha1

2012-05-06 Thread Adam D. Barratt
On Thu, 2012-05-03 at 23:09 +0100, Adam D. Barratt wrote: On Sun, 2012-04-29 at 17:36 +0100, Adam D. Barratt wrote: On Sun, 2012-04-29 at 16:54 +0100, Steve McIntyre wrote: I can do an alpha build of CDs whenever they're desired, just let me know when things are looking ready. Ah

Re: [RFH] Release of D-I Alpha1

2012-05-06 Thread Adam D. Barratt
On Sun, 2012-05-06 at 15:35 +0100, Adam D. Barratt wrote: So, in the absence of any replies or better ideas on IRC, I've scheduled a binNMU for d-i on amd64. If that goes okay then I'll do the other architectures and we can look at where we go from there. Apparently I missed that one

Re: The curious case of openjdk-6-jre-headless_6b24-1.11.1-3_amd64.deb in d7.01alpha

2012-05-15 Thread Adam D. Barratt
On Wed, 2012-05-16 at 00:30 +0530, shirish शिरीष wrote: On Tue, May 15, 2012 at 11:55 PM, shirish शिरीष shirisha...@gmail.com wrote: This is the latest effort with another mirror, as can be seen also stuck :- [...] - 100 files not

Re: The curious case of openjdk-6-jre-headless_6b24-1.11.1-3_amd64.deb in d7.01alpha

2012-05-16 Thread Adam D. Barratt
On 16.05.2012 04:06, shirish शिरीष wrote: On Wed, May 16, 2012 at 1:19 AM, Adam D. Barratt a...@adam-barratt.org.uk wrote: On Wed, 2012-05-16 at 00:30 +0530, shirish शिरीष wrote: On Tue, May 15, 2012 at 11:55 PM, shirish शिरीष shirisha...@gmail.com wrote: --2012-05-16 00:13:05-- http

Re: Preparation for d-i beta 1

2012-06-26 Thread Adam D. Barratt
On 26.06.2012 16:35, Cyril Brulebois wrote: Cyril Brulebois k...@debian.org (25/06/2012): - udeb freeze. debian-release, please put that back into place. Thanks already! Done. As discussed, I've enabled all of the blocks, including those in the can be handled by britney category. If

Re: Preparation for d-i beta 1

2012-06-27 Thread Adam D. Barratt
On Wed, 2012-06-27 at 17:59 +0100, Ben Hutchings wrote: On Tue, Jun 26, 2012 at 05:07:50PM +0100, Adam D. Barratt wrote: On 26.06.2012 16:35, Cyril Brulebois wrote: Cyril Brulebois k...@debian.org (25/06/2012): - udeb freeze. debian-release, please put that back into place. Thanks

Re: Finalizing beta2: please dak copy-installer, urgent d-i, build images

2012-09-03 Thread Adam D. Barratt
On 03.09.2012 09:31, Cyril Brulebois wrote: Cyril Brulebois k...@debian.org (02/09/2012): - urgent d-i Done, along with an unblock. - start building installation images (I think it needs at least a dinstall + a mirror pulse though); putting them into a “dot-dir” for the time being

Re: Closing in for d-i wheezy beta 3

2012-09-26 Thread Adam D. Barratt
On Wed, 2012-09-26 at 19:11 +0200, Cyril Brulebois wrote: # XXX: second look appreciated # xz compression + 4 RC bug fixes unblock grub2/1.99-23 unblock-udeb grub2/1.99-23 Looks sane enough to me. # single bugfix for pf crash, no-op for d-i: unblock kfreebsd-9/9.0-6 unblock-udeb

6.0.7 planning

2013-02-10 Thread Adam D. Barratt
Hi, We're somewhat overdue with the next Squeeze point release (6.0.7) and it'd be good to get it done before the wheezy release, so that we can pull in some upgrade fixes. As an opening gambit, some proposed dates, all of which appear to currently work for me: February 23rd March 2nd March

Upcoming stable point release (6.0.7)

2013-02-13 Thread Adam D. Barratt
Hi, The next point release for squeeze (6.0.7) is scheduled for Saturday February 23rd. Stable NEW will be frozen during the preceding Monday (18th). As usual, base-files can be uploaded at any point before the freeze. Regards, Adam -- To UNSUBSCRIBE, email to

Re: Bug#705530: unblock: brltty/4.4-10

2013-04-18 Thread Adam D. Barratt
On 18.04.2013 16:06, Cyril Brulebois wrote: Adam D. Barratt a...@adam-barratt.org.uk (17/04/2013): On Tue, 2013-04-16 at 10:18 +0200, Samuel Thibault wrote: Please unblock package brltty The intent of these changes is to fix bug #680636 by allowing to use the braille keyboard to type login

Re: Bug#705435: Gnome installability vs. GNU/kFreeBSD

2013-04-24 Thread Adam D. Barratt
On Fri, 2013-04-19 at 17:17 +0200, Didier 'OdyX' Raboud wrote: Le jeudi, 18 avril 2013 12.55:09, Steven Chamberlain a écrit : It would be really helpful if you are able to test again with pulseaudio (+ libpulse0) patched with:

Wheezy point release planning

2013-05-12 Thread Adam D. Barratt
Hi, Based on some informal queries a little while ago, the weekend of 15/16 June looks like a good date for the first wheezy point release. Would that work for everyone? Regards, Adam -- To UNSUBSCRIBE, email to debian-cd-requ...@lists.debian.org with a subject of unsubscribe. Trouble?

Re: Next (old)stable point releases

2013-09-02 Thread Adam D. Barratt
On Mon, 2013-09-02 at 18:35 +0200, Joey Schulze wrote: Jonathan Wiltshire wrote: [I don't appear to have Jonathan's mail - and nor do the list archives - so piggy-backing on Joey's.] We're much longer overdue for oldstable (February) than we are for stable (June); if we stagger them,

Re: Next (old)stable point releases

2013-09-03 Thread Adam D. Barratt
On Mon, 2013-08-19 at 14:59 +0100, Steve McIntyre wrote: On Mon, Aug 19, 2013 at 03:55:14PM +0200, Julien Cristau wrote: we should start thinking about dates for the 7.2 and 6.0.8 point releases. Which week-ends in the coming months would work for ftpmaster, press and cd? (We'd need one date

Upcoming stable point release (7.2)

2013-09-22 Thread Adam D. Barratt
Hi, The next point release for wheezy (7.2) is scheduled for Saturday October 12th. Stable NEW will be frozen during the preceding weekend. As usual, base-files can be uploaded at any point before the freeze. Regards, Adam -- To UNSUBSCRIBE, email to debian-cd-requ...@lists.debian.org

Upcoming oldstable point release (6.0.8)

2013-09-22 Thread Adam D. Barratt
Hi, The next point release for squeeze (6.0.8) is scheduled for Saturday October 19th. Oldstable NEW will be frozen during the preceding weekend. As usual, base-files can be uploaded at any point before the freeze. Regards, Adam -- To UNSUBSCRIBE, email to

Re: Scheduling for 7.3

2013-11-26 Thread Adam D. Barratt
On Sat, 2013-11-16 at 14:57 +, Jonathan Wiltshire wrote: According to the normal schedule, the point release for 7.3 is due somewhere around 12th December. Sorry for the delayed reply. :| How does everybody look for the weekends of: 14th/5th Looks okay at the moment. 21st/22nd I'm

Re: Scheduling for 7.3

2013-12-02 Thread Adam D. Barratt
On Sat, 2013-11-16 at 14:57 +, Jonathan Wiltshire wrote: According to the normal schedule, the point release for 7.3 is due somewhere around 12th December. How does everybody look for the weekends of: 14th/5th 21st/22nd 28th/29th December? Based on the responses so far, if we want to

Upcoming stable point release (7.3)

2013-12-03 Thread Adam D. Barratt
Hi, The next point release for wheezy (7.3) is scheduled for Saturday December 14th. Stable NEW will be frozen during the preceding weekend. As usual, base-files can be uploaded at any point before the freeze. Regards, Adam -- To UNSUBSCRIBE, email to debian-cd-requ...@lists.debian.org

Scheduling 7.4 and 6.0.9

2014-01-07 Thread Adam D. Barratt
Hi, Our standard time intervals lead to us looking at point releases for both stable and oldstable during February. The weekend of the 1st / 2nd February is FOSDEM, so probably best avoided. :-) How are people fixed for: 8th / 9th February 15th / 16th February 22nd / 23rd February 1st / 2nd

Re: Scheduling 7.4 and 6.0.9

2014-01-20 Thread Adam D. Barratt
On Wed, 2014-01-08 at 10:27 +, Steve McIntyre wrote: On Wed, Jan 08, 2014 at 05:50:27AM +, Adam Barratt wrote: Our standard time intervals lead to us looking at point releases for both stable and oldstable during February. The weekend of the 1st / 2nd February is FOSDEM, so probably

Upcoming stable point release (7.4)

2014-01-23 Thread Adam D. Barratt
Hi, The next point release for wheezy (7.4) is scheduled for Saturday February 8th. Stable NEW will be frozen during the preceding weekend. As usual, base-files can be uploaded at any point before the freeze. Regards, Adam -- To UNSUBSCRIBE, email to debian-cd-requ...@lists.debian.org

Upcoming oldstable point release (6.0.9)

2014-01-23 Thread Adam D. Barratt
Hi, The next point release for squeeze (6.0.9) is scheduled for Saturday February 15th. Stable NEW will be frozen during the preceding weekend. As usual, base-files can be uploaded at any point before the freeze. Regards, Adam -- To UNSUBSCRIBE, email to debian-cd-requ...@lists.debian.org

Re: Scheduling the 7.5 point release

2014-03-15 Thread Adam D. Barratt
On Sat, 2014-03-01 at 21:44 +0100, Niels Thykier wrote: We are slowly starting to prepare for the 7.5 point release and are suggesting one of the four following weekends: * April 12th/13th Looks okay at the moment. * April 19th/20th (Easter) I'm not available that weekend. * April

Re: Scheduling the 7.5 point release

2014-03-18 Thread Adam D. Barratt
On Sat, 2014-03-15 at 09:01 +, Adam D. Barratt wrote: On Sat, 2014-03-01 at 21:44 +0100, Niels Thykier wrote: We are slowly starting to prepare for the 7.5 point release and are suggesting one of the four following weekends: Based on the replies and looking again at a calendar, let's go

Upcoming stable point release (7.5)

2014-03-23 Thread Adam D. Barratt
Hi, The next point release for wheezy (7.5) is scheduled for Saturday, April 26th. Stable NEW will be frozen during the preceding weekend. As usual, base-files can be uploaded at any point before the freeze. Regards, Adam -- To UNSUBSCRIBE, email to debian-cd-requ...@lists.debian.org with

Re: Scheduling the 7.5 point release

2014-04-21 Thread Adam D. Barratt
On Tue, 2014-03-18 at 23:03 +, Adam D. Barratt wrote: On Sat, 2014-03-15 at 09:01 +, Adam D. Barratt wrote: On Sat, 2014-03-01 at 21:44 +0100, Niels Thykier wrote: We are slowly starting to prepare for the 7.5 point release and are suggesting one of the four following weekends

7.6 and 6.0.10

2014-06-04 Thread Adam D. Barratt
Hi, (Somewhat belatedly) it's time to organise the next point releases for Wheezy and Squeeze (7.6 and 6.0.10). This will be the final point release for Squeeze, incorporating as many of the packages from opu and squeeze-security as we can (some will have to be skipped - there's a security

Re: 7.6 and 6.0.10

2014-06-11 Thread Adam D. Barratt
On Wed, 2014-06-11 at 00:03 +0100, Steve McIntyre wrote: On Wed, Jun 04, 2014 at 09:53:21PM +0100, Adam Barratt wrote: (Somewhat belatedly) it's time to organise the next point releases for Wheezy and Squeeze (7.6 and 6.0.10). [...] Apologies for the delay in responding... I believe I

Upcoming stable point release (7.6)

2014-06-11 Thread Adam D. Barratt
Hi, The next point release for wheezy (7.6) is scheduled for Saturday, July 12th. Stable NEW will be frozen during the preceding weekend. As usual, base-files can be uploaded at any point before the freeze. Regards, Adam -- To UNSUBSCRIBE, email to debian-cd-requ...@lists.debian.org with a

Upcoming oldstable point release (6.0.10)

2014-06-11 Thread Adam D. Barratt
Hi, The next (and final) point release for squeeze (6.0.10) is scheduled for Saturday, July 19th. Oldstable NEW will be frozen during the preceding weekend. As usual, base-files can be uploaded at any point before the freeze. Regards, Adam -- To UNSUBSCRIBE, email to

7.7 planning

2014-09-20 Thread Adam D. Barratt
Hi, We're (over)due another wheezy point release; this time, 7.7. I propose we go for one of: 11/12 October 18/19 October 25/26 October Cheers, Adam -- To UNSUBSCRIBE, email to debian-cd-requ...@lists.debian.org with a subject of unsubscribe. Trouble? Contact listmas...@lists.debian.org

Re: 7.7 planning

2014-09-23 Thread Adam D. Barratt
On Tue, 2014-09-23 at 12:56 +0100, Neil McGovern wrote: On Tue, Sep 23, 2014 at 08:38:37AM +0200, Ansgar Burchardt wrote: Adam D. Barratt a...@adam-barratt.org.uk writes: We're (over)due another wheezy point release; this time, 7.7. I propose we go for one of: 11/12 October 18/19

Upcoming stable point release (7.7)

2014-09-24 Thread Adam D. Barratt
Hi, The next point release for wheezy (7.7) is scheduled for Saturday, October 18th. Stable NEW will be frozen during the preceding weekend. Regards, Adam -- To UNSUBSCRIBE, email to debian-cd-requ...@lists.debian.org with a subject of unsubscribe. Trouble? Contact

Bug#770870: Re: cdimage.debian.org: Untrustworthy key used to sign SHA512SUMS: DF9B 9C49 EAA9 2984 3258 9D76 DA87 E80D 6294 BE9B

2014-11-24 Thread Adam D. Barratt
C542CD59 2011-01-05 Adam D. Barratt a...@adam-barratt.org.uk sig 63C7CC90 2011-01-05 Simon McVittie s...@pseudorandom.co.uk sig 36294BE9B 2011-01-05 Debian CD signing key debian-cd@lists.debian.org sub 4096R/11CD9819 2011-01-05 sig 6294BE9B 2011-01-05

7.8 dates

2014-12-09 Thread Adam D. Barratt
Hi, In theory the 7.8 point release should be in December, but that's often a pain to organise. So let's look at January instead: 3rd / 4th - I'm busy on the Saturday 10th / 11th - Fine for me 17th / 18th - jmw's BSP 24th / 25th - I can do Saturday morning, but will be afk from early afternoon

Re: 7.8 dates

2014-12-14 Thread Adam D. Barratt
On Tue, 2014-12-09 at 20:33 +, Adam D. Barratt wrote: 31st / 1st - Fine for me I spotted earlier that that weekend is FOSDEM, which presumably changes the answer for at least some people. Regards, Adam -- To UNSUBSCRIBE, email to debian-cd-requ...@lists.debian.org with a subject

Re: 7.8 dates

2014-12-21 Thread Adam D. Barratt
On Sun, 2014-12-14 at 16:19 +0100, Ansgar Burchardt wrote: Hi, Adam D. Barratt a...@adam-barratt.org.uk writes: In theory the 7.8 point release should be in December, but that's often a pain to organise. So let's look at January instead: 3rd / 4th - I'm busy on the Saturday 10th

Upcoming stable point release (7.8)

2014-12-27 Thread Adam D. Barratt
Hi, The next point release for wheezy (7.8) is scheduled for Saturday, January 10th. Stable NEW will be frozen during the preceding weekend. Regards, Adam signature.asc Description: This is a digitally signed message part

8.1 (and maybe 7.9) planning

2015-04-30 Thread Adam D. Barratt
Hi, As seems to have become the norm, now that Jessie's out it's time to start planning for the first point release. We're also a little overdue for 7.9 as Jessie work took precedence; 7.9 really wants to take place after 8.1, as we have some packages for which pu opu stable. Suggested dates

Re: 8.1 (and maybe 7.9) planning

2015-05-20 Thread Adam D. Barratt
On Fri, 2015-05-01 at 11:17 +0100, Adam D. Barratt wrote: [Added some missed CCs; sigh] On 2015-04-30 22:16, Adam D. Barratt wrote: Hi, As seems to have become the norm, now that Jessie's out it's time to start planning for the first point release. We're also a little overdue

Upcoming stable point release (8.1)

2015-05-24 Thread Adam D. Barratt
Hi, The first point release for jessie (8.1) is scheduled for Saturday, June 6th. Stable NEW will be frozen during the preceding weekend. Regards, Adam signature.asc Description: This is a digitally signed message part

Re: 8.1 (and maybe 7.9) planning

2015-05-24 Thread Adam D. Barratt
On Thu, 2015-05-21 at 09:56 +0200, Joerg Jaspert wrote: On 13947 March 1977, Adam D. Barratt wrote: As seems to have become the norm, now that Jessie's out it's time to start planning for the first point release. We're also a little overdue for 7.9 as Jessie work took precedence; 7.9

Re: 8.1 (and maybe 7.9) planning

2015-05-23 Thread Adam D. Barratt
press@ - ping? :-) On Wed, 2015-05-20 at 21:22 +0100, Adam D. Barratt wrote: On Fri, 2015-05-01 at 11:17 +0100, Adam D. Barratt wrote: [Added some missed CCs; sigh] On 2015-04-30 22:16, Adam D. Barratt wrote: Hi, As seems to have become the norm, now that Jessie's out it's time

8.2 and 7.9 planning

2015-08-18 Thread Adam D. Barratt
Hi, We're somewhat overdue for both 8.2 and 7.9 now (in that order). Some potential September dates: 5/6th - okay for me 12/13th - the 12th doesn't work for me until at least mid-afternoon 19th/20th - looks okay 26th/27th - looks okay From a quick chat, it appears that the CD team are okay with

Re: 8.2 and 7.9 planning

2015-08-24 Thread Adam D. Barratt
On Mon, 2015-08-24 at 20:23 +0100, Adam D. Barratt wrote: On Wed, 2015-08-19 at 11:20 +0200, Ansgar Burchardt wrote: Adam D. Barratt a...@adam-barratt.org.uk writes: We're somewhat overdue for both 8.2 and 7.9 now (in that order). Some potential September dates: 5/6th - okay for me

Re: 8.2 and 7.9 planning

2015-08-24 Thread Adam D. Barratt
On Wed, 2015-08-19 at 11:20 +0200, Ansgar Burchardt wrote: Adam D. Barratt a...@adam-barratt.org.uk writes: We're somewhat overdue for both 8.2 and 7.9 now (in that order). Some potential September dates: 5/6th - okay for me Should be okay, provided I get internet on Aug 31st

Re: 8.2 and 7.9 planning

2015-08-25 Thread Adam D. Barratt
On 2015-08-24 23:19, Joerg Jaspert wrote: On 14037 March 1977, Adam D. Barratt wrote: We're somewhat overdue for both 8.2 and 7.9 now (in that order). Some potential September dates: 5/6th - okay for me 12/13th - the 12th doesn't work for me until at least mid-afternoon 19th/20th - looks okay

Upcoming stable point release (8.2)

2015-08-25 Thread Adam D. Barratt
Hi, The next point release for jessie (8.2) is scheduled for Saturday, September 5th. Processing of new uploads into jessie-proposed-updates will be frozen during the preceding weekend. Regards, Adam signature.asc Description: This is a digitally signed message part

Upcoming oldstable point release (7.9)

2015-08-25 Thread Adam D. Barratt
Hi, The next point release for wheezy (7.9) is scheduled for Saturday, September 5th. Processing of new uploads into wheezy-proposed-updates will be frozen during the preceding weekend. Regards, Adam signature.asc Description: This is a digitally signed message part

8.3 planning

2015-12-04 Thread Adam D. Barratt
Hi, We're a tad overdue for the 8.3 point release and with the holiday period coming up, getting one done in December looks like a bit of a push. On that basis, looking at January we have: 2nd/3rd - depends how much people are still suffering. :-) 9th/10th 16th/17th 23rd/24th - likely to be bad

Re: 8.3 planning

2015-12-14 Thread Adam D. Barratt
On Mon, 2015-12-14 at 19:33 +0100, Ansgar Burchardt wrote: > On Sun, 2015-12-13 at 17:22 +0000, Adam D. Barratt wrote: > > On Sun, 2015-12-06 at 16:10 -0500, Donald Norwood wrote: > > > On 12/04/2015 01:12 PM, Steve McIntyre wrote: > > > > On Fri, Dec 04, 2015 at

Re: 8.3 planning

2015-12-13 Thread Adam D. Barratt
On Sun, 2015-12-06 at 16:10 -0500, Donald Norwood wrote: > On 12/04/2015 01:12 PM, Steve McIntyre wrote: > > On Fri, Dec 04, 2015 at 05:43:54PM +, Adam Barratt wrote: > >> Hi, > >> > >> We're a tad overdue for the 8.3 point release and with the holiday > >> period coming up, getting one done

Upcoming stable point release (8.3)

2015-12-17 Thread Adam D. Barratt
Hi, The next point release for "jessie" (8.3) is scheduled for Saturday, January 23rd. Processing of new uploads into jessie-proposed-updates will be frozen during the preceding weekend. Regards, Adam

Re: Cloud images with backports APT-enabled.

2016-01-11 Thread Adam D. Barratt
On Tue, 2016-01-12 at 00:14 -0500, Brian Gupta wrote: > On Mon, Dec 28, 2015 at 9:19 AM, Charles Plessy wrote: > > Le Mon, Nov 30, 2015 at 10:31:14PM +0900, Charles Plessy a écrit : > >> > >> I started a discussion on the debian-backports mailing list. Let's see > >> how it >

8.4 and 7.10 planning

2016-02-21 Thread Adam D. Barratt
Hi, We're due both Jessie and Wheezy point releases, and are proposing doing both on the same weekend again, as we did for 8.2 and 7.9, as the CD team seem happy to try it again. Some suggested dates: March 12th / 13th March 19th / 20th March 26th / 27th - Easter, holiday weekend in at least

Re: Bug#808874: debian-installer: FTBFS on i386: 586 vs. 686

2016-02-21 Thread Adam D. Barratt
On Fri, 2015-12-25 at 18:55 +0100, Cyril Brulebois wrote: > Ben Hutchings (2015-12-24): > > On Thu, 2015-12-24 at 03:30 +0100, Cyril Brulebois wrote: > > > Ben Hutchings (2015-12-24): > > > > I already updated base-installer for this, and I think the

Re: 8.4 and 7.10 planning

2016-03-09 Thread Adam D. Barratt
-boot? On 2016-02-21 12:24, Adam D. Barratt wrote: Hi, We're due both Jessie and Wheezy point releases, and are proposing doing both on the same weekend again, as we did for 8.2 and 7.9, as the CD team seem happy to try it again. Some suggested dates: March 12th / 13th March 19th / 20th

Upcoming stable point release (8.4)

2016-03-12 Thread Adam D. Barratt
Hi, The next point release for "jessie" (8.4) is scheduled for Saturday, April 2nd. Processing of new uploads into jessie-proposed-updates will be frozen during the preceding weekend. Regards, Adam

Upcoming oldstable point release (7.10)

2016-03-12 Thread Adam D. Barratt
Hi, The next point release for "wheezy" (7.10) is scheduled for Saturday, April 2nd. Processing of new uploads into wheezy-proposed-updates will be frozen during the preceding weekend. Regards, Adam

Re: 8.4 and 7.10 planning

2016-03-07 Thread Adam D. Barratt
On Sun, 2016-02-21 at 13:07 +, Ben Hutchings wrote: > On Sun, 2016-02-21 at 12:24 +0000, Adam D. Barratt wrote: > > Hi, > > > > We're due both Jessie and Wheezy point releases, and are proposing doing > > both on the same weekend again, as we did for 8.2 and 7.9, as

8.6 planning

2016-08-07 Thread Adam D. Barratt
Hi, It's time for another Jessie point release; as wheezy's EOL, we don't have to worry about trying to fit two in at the same time. Some possible dates: August 20th/21st - doesn't work for me August 27th/28th - public holiday weekend in the UK; doesn't work for me September 3rd/4th

Upcoming stable point release (8.6)

2016-09-02 Thread Adam D. Barratt
Hi, The next point release for "jessie" (8.6) is scheduled for Saturday, September 17th. Processing of new uploads into jessie-proposed-updates will be frozen during the preceding weekend. Regards, Adam

Re: 8.6 planning

2016-08-29 Thread Adam D. Barratt
Hi, Sorry for not picking this up again sooner. On Wed, 2016-08-17 at 14:19 +0200, Ansgar Burchardt wrote: > On Sun, 2016-08-07 at 23:04 +0100, Adam D. Barratt wrote: > > It's time for another Jessie point release; as wheezy's EOL, we don't > > have to worry about tr

Re: 8.7 planning

2016-12-20 Thread Adam D. Barratt
On Mon, 2016-12-19 at 14:19 +0100, Julien Cristau wrote: > Jan 7th/8th > > Jan 14th/15th Both look okay. > Jan 21st/22nd I could do the Saturday until around lunchtime but will be AFK after that and unlikely to be around on Sunday morning at least. (So on the whole, NACK.) > Jan 28th/29th -

Upcoming stable point release (8.7)

2016-12-27 Thread Adam D. Barratt
Hi, The next point release for "jessie" (8.7) is scheduled for Saturday, January 14th. Processing of new uploads into jessie-proposed-updates will be frozen during the preceding weekend. Regards, Adam

Re: 8.8 planning

2017-03-17 Thread Adam D. Barratt
On Tue, 2017-03-14 at 12:00 +0100, Julien Cristau wrote: > It's time to start thinking about our next stable point release. Here > are some dates, please let us know which ones would work. > > * April 8-9 > * April 15-16 > * April 22-23 > * April 29-30 > * May 6-7 > > I know at least Adam can't

Upcoming stable point release (8.8)

2017-04-11 Thread Adam D. Barratt
Hi, The next point release for "jessie" (8.8) is scheduled for Saturday, May 6th. Processing of new uploads into jessie-proposed-updates will be frozen during the preceding weekend. Regards, Adam

Re: 8.8 planning

2017-04-08 Thread Adam D. Barratt
On Tue, 2017-03-14 at 12:00 +0100, Julien Cristau wrote: > It's time to start thinking about our next stable point release. Here > are some dates, please let us know which ones would work. > > * April 8-9 > * April 15-16 > * April 22-23 > * April 29-30 > * May 6-7 > > I know at least Adam can't

Upcoming oldstable point release (8.9)

2017-07-09 Thread Adam D. Barratt
Hi, The next point release for "jessie" (8.9) is scheduled for Saturday, July 22nd. Processing of new uploads into jessie-proposed-updates will be frozen during the preceding weekend. Regards, Adam

Upcoming stable point release (9.1)

2017-07-09 Thread Adam D. Barratt
Hi, The first point release for "stretch" (9.1) is scheduled for Saturday, July 22nd. Processing of new uploads into stretch-proposed-updates will be frozen during the preceding weekend. Regards, Adam

Re: Scheduling 9.1, maybe 8.9

2017-07-08 Thread Adam D. Barratt
On Sat, 2017-07-08 at 00:51 +0100, Steve McIntyre wrote: > On Sun, Jul 02, 2017 at 09:53:13PM +0100, Adam Barratt wrote: > >[sorry for the delay in replying] > > > >On Sun, 2017-06-25 at 20:10 +0100, Jonathan Wiltshire wrote: > >> Hi, > >> > >> A month or so from 9.0 bring us to about 15th July.

Re: Scheduling 9.1, maybe 8.9

2017-07-02 Thread Adam D. Barratt
[sorry for the delay in replying] On Sun, 2017-06-25 at 20:10 +0100, Jonathan Wiltshire wrote: > Hi, > > A month or so from 9.0 bring us to about 15th July. How would any of these > suit? Is 8.9 at the same time feasible? It's worked before. > 8/9 July (probably a bit soon) Definitely now too

Re: Scheduling 9.2

2017-09-17 Thread Adam D. Barratt
On Sun, 2017-09-17 at 15:31 +0100, Steve McIntyre wrote: > On Sun, Sep 17, 2017 at 03:20:05PM +0100, Jonathan Wiltshire wrote: > > On Mon, Aug 28, 2017 at 09:31:22PM +0100, Steve McIntyre wrote: > > > On Sun, Aug 27, 2017 at 04:48:14PM +0100, Jonathan Wiltshire > > > wrote: > > > > Hi, > > > > >

Re: Scheduling 9.2

2017-09-06 Thread Adam D. Barratt
On Sun, 2017-08-27 at 16:48 +0100, Jonathan Wiltshire wrote: > I'm working on dates for 9.2; by a two month cycle we're aiming for > around 23rd September. How about one of: > > 23rd/24th September > 30th Septmber/1st October > > [SRMs: needs one of you too please :) ] I'd prefer to avoid the