On Sat, Apr 14, 2012 at 06:48:11 +0100, Ben Hutchings wrote:
Would it be possible to accelerate testing migration of 3.2.14-1, so
that that happens before it's replaced by 3.2.15-1?
Set to 8 days instead of 10.
Cheers,
Julien
signature.asc
Description: Digital signature
On Sat, Apr 14, 2012 at 10:11:59 +0200, Julien Cristau wrote:
On Sat, Apr 14, 2012 at 06:48:11 +0100, Ben Hutchings wrote:
Would it be possible to accelerate testing migration of 3.2.14-1, so
that that happens before it's replaced by 3.2.15-1?
Set to 8 days instead of 10.
And
On Sat, 2012-04-14 at 13:39 +0200, Julien Cristau wrote:
On Sat, Apr 14, 2012 at 10:11:59 +0200, Julien Cristau wrote:
On Sat, Apr 14, 2012 at 06:48:11 +0100, Ben Hutchings wrote:
Would it be possible to accelerate testing migration of 3.2.14-1, so
that that happens before it's
I intend to upload linux-2.6 version 3.2.15-1 during this weekend. This
includes various important fixes from upstream stable version 3.2.15,
and may have urgency=high (to be decided). There should not be any ABI
bump.
Would it be possible to accelerate testing migration of 3.2.14-1, so
that
4 matches
Mail list logo