On Tue, 2018-06-12 at 18:00 +0200, Laura Arjona Reina wrote:
>
> El 12 de junio de 2018 13:44:52 CEST, "Adam D. Barratt" rratt.org.uk> escribió:
[...]
> > - July 7th
>
> This we (publicity) can, and prefer it.
>
> > - July 14th
>
> This, could be possible, but only one of us is available.
Hi,
On Sat, 2018-06-23 at 17:30 +0100, Adam D. Barratt wrote:
> On Tue, 2018-06-12 at 12:44 +0100, Adam D. Barratt wrote:
> [...]
> > Given all of the above, I think the sanest option is to concentrate
> > on getting 8.11 done and jessie off our radar and then get 9.5
> > sorted.
> >
> > For
On 15077 March 1977, Adam D. Barratt wrote:
>> - July 7th
>> - July 14th
>> Are people available for either or both of those dates?
> The 7th is looking like the favourite so far (although would mean
> freezing next weekend), but we still need an ftp-master (N)ACK on
> either / both date.
No way
On Tue, 2018-06-12 at 12:44 +0100, Adam D. Barratt wrote:
[...]
> Given all of the above, I think the sanest option is to concentrate
> on getting 8.11 done and jessie off our radar and then get 9.5
> sorted.
>
> For suggested dates for 9.5, we know that June 30th is a no-go,
> Debcamp starts on
Adam D. Barratt (2018-06-12):
> Given all of the above, I think the sanest option is to concentrate on
> getting 8.11 done and jessie off our radar and then get 9.5 sorted.
>
> For suggested dates for 9.5, we know that June 30th is a no-go, Debcamp
> starts on July 21st and then Debconf on the
El 12 de junio de 2018 13:44:52 CEST, "Adam D. Barratt"
escribió:
>On 2018-06-08 18:51, Adam D. Barratt wrote:
>> [Cc += debian-kernel]
>>
>> On Sun, 2018-05-20 at 12:04 +0200, Joerg Jaspert wrote:
>>> On 15037 March 1977, Jonathan Wiltshire wrote:
>[...]
>> We're past any of the above by
On Tue, Jun 12, 2018 at 12:44:52PM +0100, Adam Barratt wrote:
>On 2018-06-08 18:51, Adam D. Barratt wrote:
>
>Given all of the above, I think the sanest option is to concentrate on
>getting 8.11 done and jessie off our radar and then get 9.5 sorted.
>
>For suggested dates for 9.5, we know that
On 2018-06-08 18:51, Adam D. Barratt wrote:
[Cc += debian-kernel]
On Sun, 2018-05-20 at 12:04 +0200, Joerg Jaspert wrote:
On 15037 March 1977, Jonathan Wiltshire wrote:
[...]
We're past any of the above by now, and while looking through the to-do
list for the final jessie point release, I
-kernel: any chance of a yes/no ASAP, please?
On 2018-06-08 18:51, Adam D. Barratt wrote:
[Cc += debian-kernel]
On Sun, 2018-05-20 at 12:04 +0200, Joerg Jaspert wrote:
On 15037 March 1977, Jonathan Wiltshire wrote:
> - May 26th (meaning freeze this coming weekend, which might be a
> big
>
On Fri, 2018-06-08 at 18:51 +0100, Adam D. Barratt wrote:
> We can either accept the packages and put up with the situation for a
> short while, or do 9.5 before 8.11. In practical terms, that would
> likely mean both 9.5 and 8.11 on June 23rd, freezing both next
> weekend.
Should be fine with
El 8 de junio de 2018 19:51:18 CEST, "Adam D. Barratt"
escribió:
>[Cc += debian-kernel]
>
>On Sun, 2018-05-20 at 12:04 +0200, Joerg Jaspert wrote:
>> On 15037 March 1977, Jonathan Wiltshire wrote:
>> > - May 26th (meaning freeze this coming weekend, which might be a
>> > big
>> > ask)
>>
On Fri, Jun 08, 2018 at 06:51:18PM +0100, Adam Barratt wrote:
>[Cc += debian-kernel]
>
>On Sun, 2018-05-20 at 12:04 +0200, Joerg Jaspert wrote:
>> On 15037 March 1977, Jonathan Wiltshire wrote:
>> > - May 26th (meaning freeze this coming weekend, which might be a
>> > big
>> > ask)
>>
>> No.
>>
[Cc += debian-kernel]
On Sun, 2018-05-20 at 12:04 +0200, Joerg Jaspert wrote:
> On 15037 March 1977, Jonathan Wiltshire wrote:
> > - May 26th (meaning freeze this coming weekend, which might be a
> > big
> > ask)
>
> No.
>
> > - Jun 2nd (which may require an unusual SRM)
>
> Possible.
>
>
-BEGIN PGP SIGNED MESSAGE-
Hash: SHA256
On Tue, 2018-06-05 at 15:44 +0200, Cyril Brulebois wrote:
> > Context: https://salsa.debian.org/kernel-team/linux/merge_requests/30
>
> Many thanks for the heads-up. I'll be on the lookout for a possible
> late ABI bump then. Feel free to poke me
Hi Cyril,
On Tue, May 15, 2018 at 10:49:46PM +0200, Cyril Brulebois wrote:
> Heya,
>
> Jonathan Wiltshire (2018-05-14):
> > We're due a point release any day now. Please indicate your
> > availablility out of:
> >
> > - May 26th (meaning freeze this coming weekend, which might be a big
> >
Hi Salvatore,
Salvatore Bonaccorso (2018-06-05):
> On Tue, May 15, 2018 at 10:49:46PM +0200, Cyril Brulebois wrote:
> > I don't think we have any pending ABI bump for linux (this time), and
> > the stretch branch in debian-installer.git seems quiet, so binNMUing d-i
> > might be sufficient. I