Upcoming stable point release (9.5)

2018-06-25 Thread Adam D. Barratt
Hi,

The next point release for "stretch" (9.5) is scheduled for Saturday,
July 14th. Processing of new uploads into stretch-proposed-updates will
be frozen during the preceding weekend.

Regards,

Adam



Re: Scheduling 9.5

2018-06-25 Thread Adam D. Barratt
On Tue, 2018-06-12 at 18:00 +0200, Laura Arjona Reina wrote:
> 
> El 12 de junio de 2018 13:44:52 CEST, "Adam D. Barratt"  rratt.org.uk> escribió:
[...]
> > - July 7th
> 
> This we (publicity) can, and prefer it.
> 
> > - July 14th
> 
> This, could be possible, but only one of us is available.

After some discussion on IRC, we've decided to go with the 14th and
look at making the press side more handleable for that date.

Regards,

Adam



Help need in a Debian Based Project

2018-06-25 Thread Tarun Kumar
Dear all,

We at FOSSASIA working on project Meilix (https://github.com/fossasia/meilix 
), a Debian based distribution.

We are facing an issue with the OS that it just boots into a blank screen. We 
documented the errors occurred and the steps performed in the issue #270 
.
Meilix is based on 32 bit and we are now trying to convert it into 64 bit. We 
tried replacing the image file of 32 version with 64 bit, but it actually 
didn’t work. We documented every step performed in the issue #24 
.

You can find all the releases here: https://github.com/fossasia/meilix/releases 


And specifically you can download the latest releases from here: 1.42 GB 
meilix-xenial-20180624-i386.iso 


It would be great if we get your valuable response regarding the issue.

Thanking You

Tarun Kumar


signature.asc
Description: Message signed with OpenPGP


Re: Scheduling 9.5

2018-06-25 Thread Ansgar Burchardt
Hi,

On Sat, 2018-06-23 at 17:30 +0100, Adam D. Barratt wrote:
> On Tue, 2018-06-12 at 12:44 +0100, Adam D. Barratt wrote:
> [...]
> > Given all of the above, I think the sanest option is to concentrate
> > on getting 8.11 done and jessie off our radar and then get 9.5
> > sorted.
> > 
> > For suggested dates for 9.5, we know that June 30th is a no-go,
> > Debcamp starts on July 21st and then Debconf on the 28th. So that
> > leaves us with:
> > 
> > - July 7th
> > - July 14th
> > 
> > Are people available for either or both of those dates?
> 
> The 7th is looking like the favourite so far (although would mean
> freezing next weekend), but we still need an ftp-master (N)ACK on
> either / both date.

I still have time on either weekend.

Ansgar