On Thu, Oct 18, 2007 at 02:45:15PM +0200, Ola Lundqvist wrote:
Not working is a problem, of course, and is what the cited bug report
talks about.
Yes that is a problem, on all amd64 arches.
I guess you mean all 64-bit arches? That encompasses alpha and ia64 as
well.
As a first step,
* Steve Langasek:
If you can tell me how to do this without downloading dozens of MB of
data, I'll do it.
Well, it would've been easier if the addition of db4.5 symbol versions had
been accompanied by a shlibs bump,
Yeah, but this was a bug I tried to fix. 8-/
but something like this
The following packages cannot be installed on 'unstable' because are
depending on 'libcdio6' package which was removed from the archive:
xmms2-plugin-cdda
vlc-nox
vlc
mednafen
libdevice-cdio-perl
gstreamer-0.10-plugins-good
fuseiso9660
I'm recently moved to 'unstable' so please let me know where
Teodor a écrit :
The following packages cannot be installed on 'unstable' because are
depending on 'libcdio6' package which was removed from the archive:
xmms2-plugin-cdda
vlc-nox
vlc
mednafen
libdevice-cdio-perl
gstreamer-0.10-plugins-good
fuseiso9660
I'm recently moved to 'unstable' so
On Mon, Oct 22, 2007, Teodor wrote:
I'm recently moved to 'unstable' so please let me know where should I
report these type of problems in the case 'debian-release' is not
appropriate.
I recommend you use testing and not unstable; testing will hide the
natural problems of unstable like the
Hi,
please binNMU apache2-mpm-itk to build against apache2 2.2.6-2.
Thanks.
Stefan
signature.asc
Description: This is a digitally signed message part.
Console-data provides udebs for D-I use and therefore needs manual
approval to enter testing.
The 1.03-1 release includes the following changes:
* New upstream release. Fixed in that release:
- German Dvorak keymap. Closes: #403538
- Russian Dvorak keymap. Closes: #402153
-
On 10/22/07, Adeodato Simó [EMAIL PROTECTED] wrote:
If you'd like to use unstable, I recommend you put unstable *and*
testing in your sources.list. Life will be easier.
I'll take this advice, thanks.
(sorry for the nasty cross-posting)
hey,
Now that 2.6.23 is out and the proposed timeframe for etch 1/2 is
just over two months away, its probably a good time to start making
some progress on an etch 1/2.
Perhaps we should start with an IRC meeting? I've created a wiki page
here with an
9 matches
Mail list logo