[ 
https://issues.apache.org/jira/browse/DLAB-112?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Vira Vitanska updated DLAB-112:
-------------------------------
    Sprint:   (was: Apache DLab release 1.0)

> [Scheduler on idle]: Ability to configure scheduler for resources 
> stopping/termination on exceeding idle time
> -------------------------------------------------------------------------------------------------------------
>
>                 Key: DLAB-112
>                 URL: https://issues.apache.org/jira/browse/DLAB-112
>             Project: Apache DLab
>          Issue Type: Improvement
>            Reporter: Vira Vitanska
>            Assignee: Bohdan Hliva
>            Priority: Major
>
> As a user I want to have a scheduler for Clusters to be stopped (Spark) or 
> terminated (EMR) after XXX minutes of inactivity, so that I can reduce 
> charges during non-working period with computational resources.
>  
> *Acceptance criteria:*
> *1.* it should be default option
> *2.* radio button should be on scheduler dialog which has this option checked 
> and set to 120 minutes       
>       *2.1.* in case it was configured to 120 min and on 119 minute some 
> activity started we do not stop/terminate anything. BUT postpone 
> stopping/termination for next 120 min
> *3.* it should NOT be two schedulers at the same time (it should be 
> configured by pattern and inactivity one)



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

---------------------------------------------------------------------
To unsubscribe, e-mail: dev-unsubscr...@dlab.apache.org
For additional commands, e-mail: dev-h...@dlab.apache.org

Reply via email to