[ 
https://issues.apache.org/jira/browse/GOBBLIN-616?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Hung Tran resolved GOBBLIN-616.
-------------------------------
    Resolution: Fixed

Issue resolved by pull request #2483
[https://github.com/apache/incubator-gobblin/pull/2483]

> Add ability to fork jobs when concatenating Dags.
> -------------------------------------------------
>
>                 Key: GOBBLIN-616
>                 URL: https://issues.apache.org/jira/browse/GOBBLIN-616
>             Project: Apache Gobblin
>          Issue Type: Improvement
>          Components: gobblin-service
>    Affects Versions: 0.14.0
>            Reporter: Sudarshan Vasudevan
>            Assignee: Sudarshan Vasudevan
>            Priority: Major
>             Fix For: 0.14.0
>
>
> We add the ability to fork jobs when concatenating 2 dags, as part of 
> constructing a multi-hop path. An example use case is to allow retention jobs 
> on each hop of the path to run in parallel to the distcp jobs along a 
> multi-hop path, thus preventing the data copy on a subsequent hop from being 
> blocked on a retention job on a previous hop. 



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to