[ https://issues.apache.org/jira/browse/GOBBLIN-616?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Hung Tran resolved GOBBLIN-616. ------------------------------- Resolution: Fixed Issue resolved by pull request #2483 [https://github.com/apache/incubator-gobblin/pull/2483] > Add ability to fork jobs when concatenating Dags. > ------------------------------------------------- > > Key: GOBBLIN-616 > URL: https://issues.apache.org/jira/browse/GOBBLIN-616 > Project: Apache Gobblin > Issue Type: Improvement > Components: gobblin-service > Affects Versions: 0.14.0 > Reporter: Sudarshan Vasudevan > Assignee: Sudarshan Vasudevan > Priority: Major > Fix For: 0.14.0 > > > We add the ability to fork jobs when concatenating 2 dags, as part of > constructing a multi-hop path. An example use case is to allow retention jobs > on each hop of the path to run in parallel to the distcp jobs along a > multi-hop path, thus preventing the data copy on a subsequent hop from being > blocked on a retention job on a previous hop. -- This message was sent by Atlassian JIRA (v7.6.3#76005)