wenfeiyi666 created HBASE-25240:
---
Summary: gson format of RpcServer.logResponse is abnormal
Key: HBASE-25240
URL: https://issues.apache.org/jira/browse/HBASE-25240
Project: HBase
Issue Type:
Zhuqi Jin created HBASE-25239:
-
Summary: Upgrading HBase from 2.2.0/2.3.3 to master(3.0.0) fails
because HMaster “Failed to become active master”
Key: HBASE-25239
URL:
Zhuqi Jin created HBASE-25238:
-
Summary: Upgrading HBase from 2.2.0 to 2.3.x fails because of
“Message missing required fields: state”
Key: HBASE-25238
URL: https://issues.apache.org/jira/browse/HBASE-25238
I do not think it is worth keeping these branches even if the PR has not
been merged yet?
We do not allow force push on master and branch-* branches, so the commit
will be there even if it has been reverted, it is easy to cherry pick again
or just revert the 'revert commit'.
So if no other
Michael Stack created HBASE-25237:
-
Summary: 'hbase master stop' shuts down the cluster, not the
master only
Key: HBASE-25237
URL: https://issues.apache.org/jira/browse/HBASE-25237
Project: HBase
[
https://issues.apache.org/jira/browse/HBASE-25090?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Nick Dimiduk resolved HBASE-25090.
--
Resolution: Fixed
Backported all the way to branch-1.4. Thank you [~GeorryHuang]!
>
[
https://issues.apache.org/jira/browse/HBASE-25228?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Nick Dimiduk resolved HBASE-25228.
--
Resolution: Fixed
> Delete dev-support/jenkins_precommit_jira_yetus.sh
>
Peter Somogyi created HBASE-25236:
-
Summary: [hbase-connectors] Run package phase on spark modules
Key: HBASE-25236
URL: https://issues.apache.org/jira/browse/HBASE-25236
Project: HBase
Duo Zhang created HBASE-25235:
-
Summary: Cleanup the deprecated methods in TimeRange
Key: HBASE-25235
URL: https://issues.apache.org/jira/browse/HBASE-25235
Project: HBase
Issue Type: Sub-task
[
https://issues.apache.org/jira/browse/HBASE-25173?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Duo Zhang resolved HBASE-25173.
---
Hadoop Flags: Incompatible change,Reviewed (was: Incompatible change)
Resolution: Fixed
>
Sanjeet Nishad created HBASE-25234:
--
Summary: [Upgrade]Incompatibility in reading RS report from 2.1 RS
when Master is upgraded to 2.2+
Key: HBASE-25234
URL: https://issues.apache.org/jira/browse/HBASE-25234
And here is my +1 (binding)
* Signature: ok
* Checksum : ok
* Rat check (1.8.0_171): ok
- mvn clean apache-rat:check
* Built from source (1.8.0_171): ok
- mvn clean install -DskipTests
* Unit tests pass (1.8.0_171): ok
- mvn package -P runAllTests
* CRUD: ok
* Load 5M rows using LTT: ok
I
12 matches
Mail list logo