ASF GitHub Bot commented on HELIX-601:
--------------------------------------

Github user jicongrui commented on the pull request:

    https://github.com/apache/helix/pull/30#issuecomment-117438877
  
    The assignment follows the same logic as before, and it can be considered 
as a black box, whose input is job and output is task assignment.
    So this diff only checks the output, task assignment, and remove busy 
instances from task assignment.
    
    E.g. If the target resource change resource to a different set of 
instances, the task assignment would contain no busy instances, so job2 can be 
executed on any of the new instance.


> Allow work flow to schedule dependency jobs in parallel
> -------------------------------------------------------
>
>                 Key: HELIX-601
>                 URL: https://issues.apache.org/jira/browse/HELIX-601
>             Project: Apache Helix
>          Issue Type: New Feature
>            Reporter: Congrui Ji
>
> Currently, Helix won't schedule dependency jobs in a same work flow. For 
> example, if Job2 depends on Job1, Job2 won't be scheduled until every 
> partition of Job1 is completed.
> However, if some participant is very slow, then all dependency jobs is 
> waiting for that single participant.
> Helix should be able to schedule multiple jobs according to a parameter.
> A.C.
> 1. Introduce parallel count parameter in work flow and job queue.
> 2. Dependency jobs can be scheduled according to the parameter (Now the 
> parameter is always 1, so no parallel)
> 3. If Job2 depends on Job1, Job1 is scheduled before Job2.
> 4. No parallel jobs on the same instance. If a instance is running Job1, it 
> won't run Job2 until Job1 is finished. 



--