[ 
https://issues.apache.org/jira/browse/HELIX-733?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16545854#comment-16545854
 ] 

Hudson commented on HELIX-733:
------------------------------

FAILURE: Integrated in Jenkins build helix #1514 (See 
[https://builds.apache.org/job/helix/1514/])
[HELIX-733] Fix TestAssignableInstanceManagerControllerSwitch (narendly: rev 
bd171f26d164dc33ac91fc393d11de269c2665b0)
* (edit) 
helix-core/src/test/java/org/apache/helix/task/TestAssignableInstanceManagerControllerSwitch.java


> Fix TestAssignableInstanceManagerControllerSwitch
> -------------------------------------------------
>
>                 Key: HELIX-733
>                 URL: https://issues.apache.org/jira/browse/HELIX-733
>             Project: Apache Helix
>          Issue Type: Improvement
>            Reporter: Hunter L
>            Priority: Major
>
> This test uses RoutingTableProvider. It was not being shut down, causing an 
> ExecutorService thread to continue executing periodic updates. This RB makes 
> it so that it is shut down at the end of the test.
> Changelist:
> 1. Add shutdown() on RoutingTableProvider at the end of the test



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to