[
https://issues.apache.org/jira/browse/MYRIAD-139?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14936073#comment-14936073
]
Swapnil Daingade commented on MYRIAD-139:
-
Oh, My bad.
I looked at the CapacityScheduler code and
[
https://issues.apache.org/jira/browse/MYRIAD-143?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Adam B updated MYRIAD-143:
--
Fix Version/s: Myriad 0.1.0
> Migrate Myriad code-base to Apache git
> --
>
[
https://issues.apache.org/jira/browse/MYRIAD-143?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14936276#comment-14936276
]
Adam B commented on MYRIAD-143:
---
Enabled, resolved.
> Migrate Myriad code-base to Apache git
>
[
https://issues.apache.org/jira/browse/MYRIAD-143?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=14936278#comment-14936278
]
Adam B commented on MYRIAD-143:
---
[~mohitsoni] The Myriad code has been migrated to Apache git. Can we
[
https://issues.apache.org/jira/browse/MYRIAD-143?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Mohit Soni resolved MYRIAD-143.
---
Resolution: Fixed
Code has been successfully migrated to Apache git.
> Migrate Myriad code-base to
[
https://issues.apache.org/jira/browse/MYRIAD-41?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Adam B updated MYRIAD-41:
-
Fix Version/s: Myriad 0.1.0
> Apache Licensing
>
>
> Key: MYRIAD-41
>
[
https://issues.apache.org/jira/browse/MYRIAD-143?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Mohit Soni closed MYRIAD-143.
-
> Migrate Myriad code-base to Apache git
> --
>
> Key:
On Mon, Sep 28, 2015 at 02:15:05PM +, Marvin wrote:
> The board meeting is scheduled for Wed, 14 October 2015, 10:30 am PST. The
> report for your podling will form a part of the Incubator PMC report. The
> Incubator PMC requires your report to be submitted 2 weeks before the board
> meeting,
[
https://issues.apache.org/jira/browse/MYRIAD-44?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Adam B updated MYRIAD-44:
-
Summary: Prepare for a 0.1.0 release (was: Prepare for a 0.0.2 release)
> Prepare for a 0.1.0 release
>
[
https://issues.apache.org/jira/browse/MYRIAD-44?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Adam B updated MYRIAD-44:
-
Fix Version/s: Myriad 0.1.0
> Prepare for a 0.1.0 release
> ---
>
> Key:
[
https://issues.apache.org/jira/browse/MYRIAD-43?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Adam B updated MYRIAD-43:
-
Fix Version/s: Myriad 0.1.0
> Replace com.ebay namespace with org.apache
>
[
https://issues.apache.org/jira/browse/MYRIAD-35?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Adam B updated MYRIAD-35:
-
Assignee: Brandon Gulla (was: Adam B)
> Package scheduler/RM into a Docker image
>
[
https://issues.apache.org/jira/browse/MYRIAD-35?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Adam B reassigned MYRIAD-35:
Assignee: Adam B
> Package scheduler/RM into a Docker image
>
>
>
13 matches
Mail list logo