[GitHub] activemq-6 pull request: Fix test, adjust logging

2015-01-27 Thread asfgit
Github user asfgit closed the pull request at:

https://github.com/apache/activemq-6/pull/80


---
If your project is set up for it, you can reply to this email and have your
reply appear on GitHub as well. If your project does not have this feature
enabled and wishes so, or if the feature is enabled but not working, please
contact infrastructure at infrastruct...@apache.org or file a JIRA ticket
with INFRA.
---


[GitHub] activemq-6 pull request: Fix test, adjust logging

2015-01-26 Thread jbertram
GitHub user jbertram opened a pull request:

https://github.com/apache/activemq-6/pull/80

Fix test, adjust logging

The timeout here needed to be increased to avoid test failure when 
isNetty=true.

You can merge this pull request into a Git repository by running:

$ git pull https://github.com/jbertram/activemq-6 master_work

Alternatively you can review and apply these changes as the patch at:

https://github.com/apache/activemq-6/pull/80.patch

To close this pull request, make a commit to your master/trunk branch
with (at least) the following in the commit message:

This closes #80


commit dfb7d3c382382b6e5f0647fb81703931702d0790
Author: jbertram jbert...@redhat.com
Date:   2015-01-26T20:03:54Z

Fix test, adjust logging




---
If your project is set up for it, you can reply to this email and have your
reply appear on GitHub as well. If your project does not have this feature
enabled and wishes so, or if the feature is enabled but not working, please
contact infrastructure at infrastruct...@apache.org or file a JIRA ticket
with INFRA.
---