Dmitry Sherstobitov created IGNITE-7786:
-------------------------------------------

             Summary: Changing baseline topology on big cluster may have error 
in control.sh utility
                 Key: IGNITE-7786
                 URL: https://issues.apache.org/jira/browse/IGNITE-7786
             Project: Ignite
          Issue Type: Bug
    Affects Versions: 2.3
            Reporter: Dmitry Sherstobitov


Looks like there is hardcoded timeout for waiting result of change baseline 
operation

In big cluster there is following behaviour: (154 nodes)
 # Set new baseline topology version
 # Utility connects, but then fails by connection error
 # Cluster successfully activated



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to