Re: Fw: Impala tests and estimate
On Thu, May 12, 2016 at 11:09 PM, Nishidha Panpaliya wrote: > > > Thanks Jim for this information. > > I'd a few more queries - >What is the system configuration you are using on which the estimates >you gave hold true? RAM, HDD, CPU or any other requirement? > Times were reported on a m2.4xlarge EC2 instance. See specs here: http://www.ec2instances.info/ We also wanted to know pre-requisites to run each of these tests so that >we start preparing for it upfront. For e.g. backend tests does not need >any test data, however frontend tests do need test data to be generated >and loaded. > All tests except the backend tests require the test data to be loaded. >Are there any detailed documents listing steps to prepare and execute >all these tests. > Probably not detailed enough for you. Tracing through buildall.sh and run-all-tests.sh should give you a good idea. >Test data generation is being done by default using buildall.sh with >-testdata argument. Can we customize this step to generate different >data or some scaled (small scale) data? Do we even need to do so to >ensure Impala works with different data sets? > The tests require the test data to be set up exactly the way it is today. I highly recommend running the functional tests for validation. You can certainly customize, but it's well... custom. So we cannot really help you much there. You'll need to change the scripts/flow to your liking. >Also, does time for each of these tests as you mentioned take test data >generation and loading time into consideration or is it purely test >execution duration? > Purely test execution. >We also observed test data loading takes more than 5 hrs at our end both >on x86 and power? How much time does it take for you? Also, when should >we really need to generate test data from scratch (-format argument to >buildall.sh)? I hope it is not needed every time. > The test data does not need to be loaded from scratch every time. We have the following workflow in place that you could replicate: 1. Generate test data snapshots - run buildall.sh with -testdata to generate the test data - zip the HDFS test warehouse directory into a "data snapshot" - dump the Hive metastore database into a "metastore snapshot" - these two snapshots allow for a fast snapshot-based data load in subsequent test runs 2. Use test data snapshots in a test run: - do a buildall.sh with the -snapshot_file and -metastore_snapshot_file arguments that point to the snapshots mentioned above - data loading from these snapshots takes roughly 20-30 minutes Of course, when you make changes to the test data, then you probably need to regenerate these snapshots. I will privately send you a script that can hopefully get you started with this workflow, assuming you want to follow it. >Should we consider testing of release build and debug build separately? >Do you expect any differences in behavior? Also, what all dependencies >will need to be rebuilt in release mode? > Testing release and debug is certainly recommended. I recommend you take a look at the CMakeLists.txt in the Impala root directory to see what happens in a release build. You can also look at bin/make_release.sh to learn more. > > We are also open for a call if any developer/tester is interested in > discussing these points. Actually, we need this test plan a bit urgent as > couple of our customers are waiting for timeline. > I'm open to getting on a call next week. Best regards, Alex > > Thanks, > Nishidha > > > - Forwarded by Nishidha Panpaliya/Austin/Contr/IBM on 05/13/2016 11:11 > AM - > > From: Sudarshan Jagadale/Austin/Contr/IBM > To: Nishidha Panpaliya/Austin/Contr/IBM@IBMUS > Date: 05/13/2016 10:54 AM > Subject:Fw: Impala tests and estimate > > > FYI > Thanks and Regards > Sudarshan Jagadale > Power Open Source Solutions > - Forwarded by Sudarshan Jagadale/Austin/Contr/IBM on 05/13/2016 10:53 > AM - > > From: Jim Apple > To: [email protected] > Cc: Manish Patil/Austin/Contr/IBM@IBMUS, Sudarshan > Jagadale/Austin/Contr/IBM@IBMUS, Anup > Halarnkar/Austin/Contr/IBM@IBMUS, Valencia > Serrao/Austin/Contr/IBM@IBMUS > Date: 05/12/2016 11:56 PM > Subject:Re: Fw: Impala tests and estimate > > > > The backend tests take 12 minutes. The frontend tests take 10 seconds. The > JDBC tests take 2 minutes. The custom cluster tests take 35 minutes. The > end-to-end tests take 3 hours. > > That's in "core" mode. "exhaustive" mode quadruples the total time, IIRC, > and I'd guess that's all in the
Fw: Impala tests and estimate
Thanks Jim for this information. I'd a few more queries - What is the system configuration you are using on which the estimates you gave hold true? RAM, HDD, CPU or any other requirement? We also wanted to know pre-requisites to run each of these tests so that we start preparing for it upfront. For e.g. backend tests does not need any test data, however frontend tests do need test data to be generated and loaded. Are there any detailed documents listing steps to prepare and execute all these tests. Test data generation is being done by default using buildall.sh with -testdata argument. Can we customize this step to generate different data or some scaled (small scale) data? Do we even need to do so to ensure Impala works with different data sets? Also, does time for each of these tests as you mentioned take test data generation and loading time into consideration or is it purely test execution duration? We also observed test data loading takes more than 5 hrs at our end both on x86 and power? How much time does it take for you? Also, when should we really need to generate test data from scratch (-format argument to buildall.sh)? I hope it is not needed every time. Should we consider testing of release build and debug build separately? Do you expect any differences in behavior? Also, what all dependencies will need to be rebuilt in release mode? We are also open for a call if any developer/tester is interested in discussing these points. Actually, we need this test plan a bit urgent as couple of our customers are waiting for timeline. Thanks, Nishidha - Forwarded by Nishidha Panpaliya/Austin/Contr/IBM on 05/13/2016 11:11 AM - From: Sudarshan Jagadale/Austin/Contr/IBM To: Nishidha Panpaliya/Austin/Contr/IBM@IBMUS Date: 05/13/2016 10:54 AM Subject: Fw: Impala tests and estimate FYI Thanks and Regards Sudarshan Jagadale Power Open Source Solutions - Forwarded by Sudarshan Jagadale/Austin/Contr/IBM on 05/13/2016 10:53 AM - From: Jim Apple To: [email protected] Cc: Manish Patil/Austin/Contr/IBM@IBMUS, Sudarshan Jagadale/Austin/Contr/IBM@IBMUS, Anup Halarnkar/Austin/Contr/IBM@IBMUS, Valencia Serrao/Austin/Contr/IBM@IBMUS Date: 05/12/2016 11:56 PM Subject:Re: Fw: Impala tests and estimate The backend tests take 12 minutes. The frontend tests take 10 seconds. The JDBC tests take 2 minutes. The custom cluster tests take 35 minutes. The end-to-end tests take 3 hours. That's in "core" mode. "exhaustive" mode quadruples the total time, IIRC, and I'd guess that's all in the end-to-end tests, but I'm not sure. On Thu, May 12, 2016 at 5:40 AM, Nishidha Panpaliya wrote: Hi All, Could you please let me know the scope of Impala unit testing? I mean what all tests should be executed and ensured. I saw BE, FE, EE, JDBC, Cluster tests in run-all-tests.sh. And a guess estimate of how much time each of these take to execute? Thanks, Nishidha - Forwarded by Nishidha Panpaliya/Austin/Contr/IBM on 05/12/2016 06:07 PM - From: Nishidha Panpaliya/Austin/Contr/IBM To: [email protected] Cc: "Jim Apple" , Manish Patil/Austin/Contr/IBM@IBMUS, Sudarshan Jagadale/Austin/Contr/IBM@IBMUS, "Tim Armstrong" , Valencia Serrao/Austin/Contr/IBM@IBMUS Date: 03/29/2016 06:59 PM Subject: Re: Impala tests and estimate Just one more request. We'll be thankful if we could also get to know the count of each of these tests (for e.g. there are 71 backend tests). Thanks, Nishidha Nishidha Panpaliya---03/29/2016 10:05:29 AM---Hi All, I again need your help in understanding Impala tests to be run and ensured and their estimat From: Nishidha Panpaliya/Austin/Contr/IBM To: [email protected], "Tim Armstrong" < [email protected]>, "Jim Apple" Cc: Sudarshan Jagadale/Austin/Contr/IBM@IBMUS, Manish Patil/Austin/Contr/IBM@IBMUS, Valencia Serrao/Austin/Contr/IBM@IBMUS Date: 03/29/2016 10:05 AM Subject: Impala tests and estimate Hi All, I again need your help in understanding Impala tests to be run and ensured and their estimates. Last time, I know you had given way to run only backend tests and it was helpful to us. I've also gone through run-all-tests.sh which triggers backend test, frontend test, end-to-end tests, etc. Could you provide me individual commands to run each of them and if any setup steps are required? Also, I would like to know if there are any specific system requirements that I must have up-front to run all these tests. Along with these commands/scripts, I'm also interested in knowing how much time each of these tests take to run, if we do not run into any issues. This is required to know the guess estimate of how long will this activity be taking from now. Thanks in advance, Nishidha
Re: Fw: Impala tests and estimate
The backend tests take 12 minutes. The frontend tests take 10 seconds. The JDBC tests take 2 minutes. The custom cluster tests take 35 minutes. The end-to-end tests take 3 hours. That's in "core" mode. "exhaustive" mode quadruples the total time, IIRC, and I'd guess that's all in the end-to-end tests, but I'm not sure. On Thu, May 12, 2016 at 5:40 AM, Nishidha Panpaliya wrote: > Hi All, > > Could you please let me know the scope of Impala unit testing? I mean what > all tests should be executed and ensured. I saw BE, FE, EE, JDBC, Cluster > tests in run-all-tests.sh. > And a guess estimate of how much time each of these take to execute? > > Thanks, > Nishidha > - Forwarded by Nishidha Panpaliya/Austin/Contr/IBM on 05/12/2016 > 06:07 PM - > > From: Nishidha Panpaliya/Austin/Contr/IBM > To: [email protected] > Cc: "Jim Apple" , Manish > Patil/Austin/Contr/IBM@IBMUS, Sudarshan Jagadale/Austin/Contr/IBM@IBMUS, > "Tim Armstrong" , Valencia > Serrao/Austin/Contr/IBM@IBMUS > Date: 03/29/2016 06:59 PM > Subject: Re: Impala tests and estimate > -- > > > Just one more request. > > We'll be thankful if we could also get to know the count of each of these > tests (for e.g. there are 71 backend tests). > > Thanks, > Nishidha > > [image: Inactive hide details for Nishidha Panpaliya---03/29/2016 10:05:29 > AM---Hi All, I again need your help in understanding Impala]Nishidha > Panpaliya---03/29/2016 10:05:29 AM---Hi All, I again need your help in > understanding Impala tests to be run and ensured and their estimat > > From: Nishidha Panpaliya/Austin/Contr/IBM > To: [email protected], "Tim Armstrong" < > [email protected]>, "Jim Apple" > Cc: Sudarshan Jagadale/Austin/Contr/IBM@IBMUS, Manish > Patil/Austin/Contr/IBM@IBMUS, Valencia Serrao/Austin/Contr/IBM@IBMUS > Date: 03/29/2016 10:05 AM > Subject: Impala tests and estimate > -- > > > Hi All, > > I again need your help in understanding Impala tests to be run and ensured > and their estimates. > > Last time, I know you had given way to run only backend tests and it was > helpful to us. I've also gone through run-all-tests.sh which triggers > backend test, frontend test, end-to-end tests, etc. Could you provide me > individual commands to run each of them and if any setup steps are > required? Also, I would like to know if there are any specific system > requirements that I must have up-front to run all these tests. > > Along with these commands/scripts, I'm also interested in knowing how much > time each of these tests take to run, if we do not run into any issues. > This is required to know the guess estimate of how long will this activity > be taking from now. > > Thanks in advance, > Nishidha > > > >
Fw: Impala tests and estimate
Hi All, Could you please let me know the scope of Impala unit testing? I mean what all tests should be executed and ensured. I saw BE, FE, EE, JDBC, Cluster tests in run-all-tests.sh. And a guess estimate of how much time each of these take to execute? Thanks, Nishidha - Forwarded by Nishidha Panpaliya/Austin/Contr/IBM on 05/12/2016 06:07 PM - From: Nishidha Panpaliya/Austin/Contr/IBM To: [email protected] Cc: "Jim Apple" , Manish Patil/Austin/Contr/IBM@IBMUS, Sudarshan Jagadale/Austin/Contr/IBM@IBMUS, "Tim Armstrong" , Valencia Serrao/Austin/Contr/IBM@IBMUS Date: 03/29/2016 06:59 PM Subject: Re: Impala tests and estimate Just one more request. We'll be thankful if we could also get to know the count of each of these tests (for e.g. there are 71 backend tests). Thanks, Nishidha From: Nishidha Panpaliya/Austin/Contr/IBM To: [email protected], "Tim Armstrong" , "Jim Apple" Cc: Sudarshan Jagadale/Austin/Contr/IBM@IBMUS, Manish Patil/Austin/Contr/IBM@IBMUS, Valencia Serrao/Austin/Contr/IBM@IBMUS Date: 03/29/2016 10:05 AM Subject:Impala tests and estimate Hi All, I again need your help in understanding Impala tests to be run and ensured and their estimates. Last time, I know you had given way to run only backend tests and it was helpful to us. I've also gone through run-all-tests.sh which triggers backend test, frontend test, end-to-end tests, etc. Could you provide me individual commands to run each of them and if any setup steps are required? Also, I would like to know if there are any specific system requirements that I must have up-front to run all these tests. Along with these commands/scripts, I'm also interested in knowing how much time each of these tests take to run, if we do not run into any issues. This is required to know the guess estimate of how long will this activity be taking from now. Thanks in advance, Nishidha
Re: Impala tests and estimate
Here is a copy of part of our internal wiki on how to run tests: You can then run the front-end tests with cd fe; mvn -fae test; cd .. This can be narrowed by passing mvn arguments specifying which test class or test method you want to run, like mvn -fae test -Dtest=AnalyzeStmtsTest mvn -fae test -Dtest=AnalyzeStmtsTest#TestStar You can run the backend tests with # The Impala cluster must not be running for the backend tests ./bin/start-impala-cluster.py --kill ./bin/run-backend-tests.sh # or ctest As in the frontend tests, you can specify which test you want to run: ctest --output-on-failure -R expr-test # also shows what broke, if anything To only build the backend test run: make be-test You can run the end-to-end tests with ./tests/run-tests.py Or run a specific one with ./tests/run-tests.py metadata # Run all the tests in a directory ./tests/run-tests.py metadata -k test_partition_metadata_compatibility # Run only the test with a particular nam On Mon, Mar 28, 2016 at 9:35 PM, Nishidha Panpaliya wrote: > > > Hi All, > > I again need your help in understanding Impala tests to be run and ensured > and their estimates. > > Last time, I know you had given way to run only backend tests and it was > helpful to us. I've also gone through run-all-tests.sh which triggers > backend test, frontend test, end-to-end tests, etc. Could you provide me > individual commands to run each of them and if any setup steps are > required? Also, I would like to know if there are any specific system > requirements that I must have up-front to run all these tests. > > Along with these commands/scripts, I'm also interested in knowing how much > time each of these tests take to run, if we do not run into any issues. > This is required to know the guess estimate of how long will this activity > be taking from now. > > Thanks in advance, > Nishidha > >
Re: Impala tests and estimate
Just one more request. We'll be thankful if we could also get to know the count of each of these tests (for e.g. there are 71 backend tests). Thanks, Nishidha From: Nishidha Panpaliya/Austin/Contr/IBM To: [email protected], "Tim Armstrong" , "Jim Apple" Cc: Sudarshan Jagadale/Austin/Contr/IBM@IBMUS, Manish Patil/Austin/Contr/IBM@IBMUS, Valencia Serrao/Austin/Contr/IBM@IBMUS Date: 03/29/2016 10:05 AM Subject:Impala tests and estimate Hi All, I again need your help in understanding Impala tests to be run and ensured and their estimates. Last time, I know you had given way to run only backend tests and it was helpful to us. I've also gone through run-all-tests.sh which triggers backend test, frontend test, end-to-end tests, etc. Could you provide me individual commands to run each of them and if any setup steps are required? Also, I would like to know if there are any specific system requirements that I must have up-front to run all these tests. Along with these commands/scripts, I'm also interested in knowing how much time each of these tests take to run, if we do not run into any issues. This is required to know the guess estimate of how long will this activity be taking from now. Thanks in advance, Nishidha
Impala tests and estimate
Hi All, I again need your help in understanding Impala tests to be run and ensured and their estimates. Last time, I know you had given way to run only backend tests and it was helpful to us. I've also gone through run-all-tests.sh which triggers backend test, frontend test, end-to-end tests, etc. Could you provide me individual commands to run each of them and if any setup steps are required? Also, I would like to know if there are any specific system requirements that I must have up-front to run all these tests. Along with these commands/scripts, I'm also interested in knowing how much time each of these tests take to run, if we do not run into any issues. This is required to know the guess estimate of how long will this activity be taking from now. Thanks in advance, Nishidha