Mel,
We need to include all the smoke tests, which should be run on any
build to ensure that the basic functionality of the build has been
retained.
Also, we should review other test cases that might help reveal a
regression... for instance, if we mess with wireless drivers, we need
to do
Ah, so it is! Thanks for the catch, Bert - fixed.
Bert Freudenberg wrote:
> On 09.12.2008, at 19:23, Mel Chua wrote:
>
>> I believe that means that we can consider the list of test cases here as
>> final (Joe/Kim, please holler if I'm incorrect):
>> http://wiki.laptop.org/go/Test_cases_8.2.1
>
>
On 09.12.2008, at 19:23, Mel Chua wrote:
> I believe that means that we can consider the list of test cases
> here as
> final (Joe/Kim, please holler if I'm incorrect):
> http://wiki.laptop.org/go/Test_cases_8.2.1
The Etoys ticket number is 8982 not 9045 as listed on that page.
And please use
(The intent of this email is to make "what's going on with 8.2.1
testing" as transparent as possible.)
I checked after the 8am work estimate cutoff, and made sure that the
test plan matched up with the trac tickets listed at [[Eco/8.2.1]] - as
of right now, it does. (Sweet!)
I believe that mea