[Devel] Re: [RFC v14-rc2][PATCH 5/7] Infrastructure for work postponed to the end of checkpoint/restart

2009-03-31 Thread Dave Hansen
On Tue, 2009-03-31 at 01:32 -0400, Oren Laadan wrote: Add a interface to postpone an action until the end of the entire checkpoint or restart operation. This is useful when during the scan of tasks an operation cannot be performed in place, to avoid the need for a second scan. Why aren't we

[Devel] Re: [RFC v14-rc2][PATCH 5/7] Infrastructure for work postponed to the end of checkpoint/restart

2009-03-31 Thread Oren Laadan
Dave Hansen wrote: On Tue, 2009-03-31 at 01:32 -0400, Oren Laadan wrote: Add a interface to postpone an action until the end of the entire checkpoint or restart operation. This is useful when during the scan of tasks an operation cannot be performed in place, to avoid the need for a second