On Tue, 21 Feb 2023 21:04:07 +0100, Marek Vasut wrote:
> The VS signal change is synchronized to HS signal change, start the
> info graphics with that event, instead of having that event occur in
> the middle of it.
>
> Scope trace of DPI bus with HS/VS active HIGH looks as follows:
>
Hi Marek.
On Tue, Feb 21, 2023 at 09:04:07PM +0100, Marek Vasut wrote:
> The VS signal change is synchronized to HS signal change, start the
> info graphics with that event, instead of having that event occur in
> the middle of it.
>
> Scope trace of DPI bus with HS/VS active HIGH looks as
The VS signal change is synchronized to HS signal change, start the
info graphics with that event, instead of having that event occur in
the middle of it.
Scope trace of DPI bus with HS/VS active HIGH looks as follows:
...__
VS...___/__ __\__...