Re: [PATCH v2 2/2] drm/msm/dp: do not stop transmitting phy test pattern during DP phy compliance test

2022-04-26 Thread Stephen Boyd
Quoting Kuogee Hsieh (2022-04-25 17:16:53) > At normal operation, transmit phy test pattern has to be terminated before > DP controller switch to video ready state. However during phy compliance > testing, transmit phy test pattern should not be terminated until end of > compliance test which

[PATCH v2 2/2] drm/msm/dp: do not stop transmitting phy test pattern during DP phy compliance test

2022-04-25 Thread Kuogee Hsieh
At normal operation, transmit phy test pattern has to be terminated before DP controller switch to video ready state. However during phy compliance testing, transmit phy test pattern should not be terminated until end of compliance test which usually indicated by unplugged interrupt. Only stop