So I'm not the only one who can't keep your names straight!
73 de Jim - AD6CW
On 2/19/2013 11:27 AM, Eric Swartz - WA6HHQ, Elecraft wrote:
Hmm, I'm the twin who signs the checks..
Based on the frequent times I'm addressed as 'Wayne' and Wayne is
addressed as 'Eric' at shows, we're totally con
: [Elecraft] KX3 Upgrades
Hmm, I'm the twin who signs the checks..
Based on the frequent times I'm addressed as 'Wayne' and Wayne is addressed
as 'Eric' at shows, we're totally confused on the twin issue. ;-)
ID Hint - I have a little less hair..
Eric
elecraft.c
Hmm, I'm the twin who signs the checks..
Based on the frequent times I'm addressed as 'Wayne' and Wayne is
addressed as 'Eric' at shows, we're totally confused on the twin issue. ;-)
ID Hint - I have a little less hair..
Eric
elecraft.com
On 2/18/2013 6:37 PM, Jim Wiley wrote:
So, which on
The one that didn't give you what you wanted first...:-)
Chuckle
Gary
On 19 February 2013 13:37, Jim Wiley wrote:
>
>
> So, which one is the evil twin?
>
>
> - Jim,KL7CC
>
>
> Direct from one of the Elecraft Twins: "We prioritized the amp ahead of it
> (same engineer on both projects).
>
>
So, which one is the evil twin?
- Jim,KL7CC
Direct from one of the Elecraft Twins: "We prioritized the amp ahead of it
(same engineer on both projects).
I'm guessing we'll be field-testing 2-meter modules around Dayton, assuming
all goes well. (Did I mention this thing is incredibly small?)"
Direct from one of the Elecraft Twins: "We prioritized the amp ahead of it
(same engineer on both projects).
I'm guessing we'll be field-testing 2-meter modules around Dayton, assuming
all goes well. (Did I mention this thing is incredibly small?)
73,
Wayne
N6KR"
On Mon, Feb 18, 2013 at 8:30 P
Which will come first the KX3 2 meter board or the 100W amp?
R Thorpe K6CG
__
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:Elecraft@mailman.qth.net
This
7 matches
Mail list logo