> Am 15.05.2021 um 11:23 schrieb Bastien : > > Kyle Meyer writes: > >> It looks like the fix from the above commit (c1558d34d) was later broken >> by the transition to the org-duration library in Org 9.1, specifically >> 7e8cf5f4c (Use Org duration library, 2017-02-08). > > I'm not able to

Re: Using est+ with effort estimate range

2021-05-15 Thread Bastien
Kyle Meyer writes: > It looks like the fix from the above commit (c1558d34d) was later broken > by the transition to the org-duration library in Org 9.1, specifically > 7e8cf5f4c (Use Org duration library, 2017-02-08). I'm not able to reproduce this bug from the maint branch, closing it right

Re: Using est+ with effort estimate range

2020-09-13 Thread Kyle Meyer
Thanks for the report, and sorry for the slow reply. Axel Kielhorn writes: >> Am 30.05.2020 um 14:40 schrieb Axel Kielhorn : >> >> Hello, >> >> according to the manual, there is a special column type for column view >> >> ‘est+’ Add low-high estimates. >> [...] > > There was a bug

Re: Using est+ with effort estimate range

2020-06-02 Thread Axel Kielhorn
> Am 30.05.2020 um 14:40 schrieb Axel Kielhorn : > > Hello, > > according to the manual, there is a special column type for column view > > ‘est+’Add low-high estimates. > > This is explained later: > > The ‘est+’ summary type requires further explanation. It is used for >

Using est+ with effort estimate range

2020-05-30 Thread Axel Kielhorn
Hello, according to the manual, there is a special column type for column view ‘est+’ Add low-high estimates. This is explained later: The ‘est+’ summary type requires further explanation. It is used for combining estimates, expressed as low-high ranges. For example, instead of estimating a