RE: [Orgmode] Problem with date calculations in a table

2008-08-15 Thread Chris Randle
Nick Dokos wrote: I've been trying to make a table with the following structure: column 1 contains either a date or is empty; column 2 contains a date that's calculated from the corresponding date in column 1 (if column 1 contains a date) or is empty (if column 1 is empty). In the example

Re: [Orgmode] Problem with date calculations in a table

2008-08-15 Thread Nick Dokos
Chris Randle [EMAIL PROTECTED] wrote: Nick Dokos wrote: I've been trying to make a table with the following structure: column 1 contains either a date or is empty; column 2 contains a date that's calculated from the corresponding date in column 1 (if column 1 contains a date) or is empty

RE: [Orgmode] Problem with date calculations in a table

2008-08-15 Thread Stephan Schmitt
Nick Dokos wrote: Chris Randle wrote: I had problems getting date arithmetic to work in tables. I posted my findings and solutions here: http://article.gmane.org/gmane.emacs.orgmode/6536/ Don't know if it will fix your problem (too lazy to try!) but I suspect it will. It did! I don't