EMC test cell

1996-10-03 Thread Marcouiller, St�phane
Bonjour, I am currently looking for a EMC test cell. The dimensions of the EUT that are going to be tested in this enclosure are 1 cubic meter (3.3 cubic feet). I want the enclosure to be at least capable of pre-compliance in the emission as well as in susceptibility. If you could give

Re: UL 1950/CSA 22.2 No. 95

1996-10-03 Thread Bao Tran
Reply to: REUL 1950/CSA 22.2 No. 950 Art and Egon, In general, the recognized or certified components program is set up to facilitate component and material manufacturers in selling their products to user or manufacturers. If you selected a right and applicable recognized/certified

Re: O.A.T.S. enclosure

1996-10-03 Thread Bill Franklin JR
Hello, We built a 3 Meter site a few years back - maybe some of our experiences will help. We built it using all wood framing with nails no bigger than 16 penny (about 2 to 2 1/4). We have two windows with plastic frames (to let in some light), a ridge vent that is made of cardboard (for

O.A.T.S. enclosure

1996-10-03 Thread Tolbert, J. Joe x1105
Winter is coming and Hurricane Fran took my fabric-type Air Support structure with him leaving my 10 meter all-weather Open Air Test Site as a fair-weather site. :( How about passing on your experiences regarding problems with any particular types of PERMANENT building schemes to enclose RFI

Re: UL 1950/CSA 22.2 No. 950

1996-10-03 Thread Art Michael
Hello Egon, My comments follow your responses. -- On 30 Sep 1996, Egon H. Varju wrote: The way most safety agencies look at this is that if all the materials used meet or exceed Class B requirements, then the

Telecom Regulatory Test Equipment

1996-10-03 Thread Kevin Harris
Does anybody know of any companies that manufactures a good telecom test set (or parts of test sets) that are flexible enough to adapt to several countries regulations (especially Europeen}. I know this isn't strictly a EMC or PS issue but I figure most EMC and PS people live next door to telecom

Re: Taiwan EMC requirments.

1996-10-03 Thread rene
On Wed, 2 Oct 1996 grasso%stkww...@ccsvm.stortek.com wrote: Question to the group... Does anyone know if when ITE equipment will be comprehensively included or will the implmentation be done piece meal?? I think it should read: Jul. 1st 1997 Computer and

Re: Taiwan EMC requirments.

1996-10-03 Thread Mike Kuo
Taiwan EMC requirements: Implementing date Product group Jan.01 ,1997 TV, VCR,FAX machine, copier July 01, 1997 Household appliances, ITE Jan. 01, 1998 Microwave Oven, Electric Tool, Telephone,and