#Paul Rampelbergh wrote:
#
# Is there a need to have a license to posses and operate EMC
# measurement tools?
#
#In the UK... none that I know of.
#--
#Regards,
#Phil Ford
You might like to check the situation with the following person;
Steve Hewitt of the Radiocommunications Agency, Test and
Does anyone know what the safety requirements are for Peru and Chile.
i.e., do they have their own safety agencies and/or standards which
require additional evaluation or will they accept the major marks like
UL and TUV? We are a power supply manufacturer whose customer makes an
ITE (IEC950)
Correction - Michael Cusanelli kindly reported that Chinese Taipei is
actually another name for Taiwan. So the only significant parties not
signing the proposed MRA is Japan and Korea. Thanks Michael.
Eric Lifsey
National Instruments
eric.lif...@natinst.com on 01/05/98 02:56:35 PM
Please
I've seen switchers cause noise envelopes and
picket fences well into the MHz range. The switching
freq is what (?) 100 kHz, 150 kHz ...
But, for some reason a pulse with a 20 nano-second period
makes me think that maybe a digital signal such as a square
wave is getting differentiated by
Bob Tims wrote:
Happy New Year All,
I have an interesting noise problem brought to me.
The noise is a 500-900 mV pulse seen at 50 MHz on a
power lead from a DC to DC converter (48V to 5V) to a
VME cage.
There were two scenarios: first, both the power supply
and the cage are
5 matches
Mail list logo