RE: Upcoming EMC Seminar

1998-02-12 Thread George, David L
Well said. Dave George Unisys (sorry for the plug) -- From: Rose, Manning I[SMTP:ros...@srdpost.daytonoh.ncr.com] Sent: Thursday, February 12, 1998 9:34 AM To: emc-p...@ieee.org; richard_c...@iris.scitex.com; Jim Hulbert Subject: Upcoming EMC Seminar

Position Available

1998-02-12 Thread Jack Cook
EMC ENGINEER The Document Company, Xerox presently has an opening in our Corporate Strategic Services facility in El Segundo, CA., for a Sr. EMC engineer. You will ensure products meet regulatory requirements by providing board and systems level design guidance, conducting simulations and

RE: Red LED's

1998-02-12 Thread Jim Eichner
It was me that started the most recent thread on this. Here are all the responses I received, in no particular order: (separated by *'s ). Of course, for European approval purposes, IEC73 has the final say, but it is as open to interpretation as any standard. It is interesting to note

RE: ferrite tiles

1998-02-12 Thread Kurt Fischer
Another source is Fair-rite Corporation in New York State (914.895.2055). _ Kurt B. Fischer International Compliance Corporation 802 N. Kealy Lewisville, TX 75057-3136 Voice: 972.436.9600 Fax:972.436.2667 e-mail: kfisc...@icomply.com web page:

Upcoming EMC Seminar

1998-02-12 Thread Rose, Manning I
Frankly, I like to have information on EMC and Safety matters. I do believe that people have failed to recognize that there can be information on seminars. If they want the info supplied by an independent third party, sobeit. From looking at the informational memos, I fail to see the blatant

Blatant advertising versus information

1998-02-12 Thread Ing. Gert Gremmen
To all, I agree that limited amount of announcing publicity is no violation. Keep it short however, and limit it to facts. Want to supply more info: add a link or e-mail address. == CE-test, qualified testing, Consultancy, Compliance tests for EMC and Electrical Safety 15 Great EMC-design

RE: Looking for info on designing EMI filters

1998-02-12 Thread Ing. Gert Gremmen
Hello Patrick and group, Before considering any filtering just look at the problem. Theoretically what you have is a switch, followed by a load. The switch is a differential switch. So only RF-components should appear as a differential mode voltage between the two supply lines. A simple

Re[4]: Upcoming EMC Seminar

1998-02-12 Thread bogdan . matoga
I second Max's presentation. Bogdan. bogdan.mat...@fibre.com __ Reply Separator _ Subject: RE: Re[2]: Upcoming EMC Seminar Author: Max Kelson mkel...@es.com at Internet List-Post: emc-pstc@listserv.ieee.org Date:

RE: spacings

1998-02-12 Thread POWELL, DOUG
Eric, I had a similar problem with a DeviceNet interface. Both sides are low voltage and the spec says it should have a 500V isolation. I do not consider this a safety spacing as such but my PCB designers needed some guidance. I used the full 500V spacings but not from the Overvoltage

Re: Responsibility for DoC

1998-02-12 Thread Allan G. Carr
In article 199802051145_mc2-3210-5...@compuserve.com, Peter E. Perkins peperk...@compuserve.com writes Jim I agree with you, you are responsible for the product - its design and manufacturing (albiet thru a contract manufacturer) - so you will develop your technical file (have your