Hi Amund,
Yes, load up to worst case and then measure after 3 seconds for worst case
LOAD fault (6.2.2.2) and SOURCE fault (6.2.2.3)
Load fault is simple. We do this with an electronic load with a
progressively stepped constant current load. 5 second dwell time and keep
going until power su
Hi, Ken,
The products are large and returning to factory for relabeling would be
expensive. I'm trying to get a picture to confirm, but I believe it's a
case of a wrong file/factory location number due to multiple factory
locations (i.e. an additional factory was brought online and there was a
la
Hi Adam;
Is the product small/light enough that it could be returned to the factory
for relabelling?
What exactly is wrong with the labels? You mentioned the ratings are
correct. Is the NRTL logo or file number incorrect? Some parts of the
label may be changed without a field marking exercise, bu
Thanks James,
As I understand you, the 15W limit must not be exceeded after a single fault
(within 3 seconds). Right?
BR
Amund
Fra: James Pawson (U3C)
Sendt: 24. oktober 2023 10:41
Til: EMC-PSTC@LISTSERV.IEEE.ORG
Emne: Re: [PSES] Wire insulation - Flammability - IEC/EN 62368-1
Hi
4 matches