Does anybody know what the regulatory requirements are for ITE equipment
shipping from one company within Sweden to another company within Sweden?
Are they any different than the normal European Union requirements? Is
there any difference in timing (i.e. testing, reports, shipping, etc...)? I
and US)
would be much appreciated.
Thanks,
Brent Pahl
---
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.
To cancel your subscription, send mail to:
majord...@ieee.org
with the single line
]
Sent: Thursday, January 11, 2001 11:02 AM
To: Brent Pahl; Tudor, Allen; EMC-PCST (E-mail)
Subject: Re: Site Correlation
Have to take strong exception. If EUT is much larger than comb generator, a
correlation between sites using the comb generator will not work for the
larger EUT. Measurement
Allen,
We just did this in our 3-meter lab using a comb generator. After
interviewing several test labs, I found out that they use comb generator's
occasionally to see if they are still properly calibrated. Evidently, a
good comb generator will give a consistent output, give or take 0.5dB,
done? This one sounds odd to
me, but I heard it through the grapevine and wanted to verify or disprove
it.
Thanks for you help! I look forward to your responses.
Sincerely,
Brent Pahl
EMC/Compliance Engineer
Dynarc, Inc.
bre...@dynarc.com
done? This one sounds odd to
me, but I heard it through the grapevine and wanted to verify or disprove
it.
Thanks for you help! I look forward to your responses.
Sincerely,
Brent Pahl
EMC/Compliance Engineer
Dynarc, Inc.
bre...@dynarc.com
6 matches
Mail list logo