It _is_ true that the equipment must be functional after the lightning tests.
Lightning is just one of the tests that are to be performed. The others
are power induction and power contact (aka power cross).
One must consider these other tests in designing in a protection scheme for
these requirm
I just received this important news article, that I had to share with everyone about an improper fuse application...
--
The following article was taken from the Arkansas Democrat Gazette, July 25, 1996:
Two Local Men Injured in F
China (PRC: Peoples Republic of China) has a Standards Institute and Lab
for EMC testing.
contact:
Chinese Electronics Standardization Institute
1 An Ding Men Dongdajie
PO Box 1101
Beijing, China
Postcode 10007
Tel: (01) 4012601
fx:(01) 4012687
Hope this helps.
mj
--
Does anyone know of a new standard/requirements in europe that bans or
restricts the use
of lead in products or in components?
I am specifically interested in this with respect to the use of lead in
component leads.
thanks,
M. Jamison
Reply to
Does anyone know of a new standard in europe that bans or restricts the use
of lead in products or in components?
I am specifically interested in this with respect to the use of lead in
component leads.
thanks,
Reply to:
_
Michae
>Does CENELEC have a web presence?
http://www.fdgroup.co.uk/codus/ceccnews.htm
>Does anyone have their phone or fax numbers?
European Committee for Electrotechnical Standardization (CENELEC)
35, rue de Stassart
B-1050 Brussels, Belgium
PH: (2) 5196871
FX: (2) 5196919
TX: 172210097
Reply to:
6 matches
Mail list logo