All,

I am working with a GTEM Cell and wish to perform self verification of our
Class A products. We have going to an outside testing house for FCC
verification and wish now to do our own verification.

*********************************************************************
WHAT I AM LOOKING FOR IS THE....

Step by Step procedure for calculating and performing Data 
Correlation between a GTEM Cell and OATS !

**************************************************************

In researching what has to be done to accomplish this task, I have gathered
the following information...

1)I Do NOT have to submit the correlated data to the FCC


2) The test does require that we do three ( 3 )  "separate" setups and break
down when we start to collect data.

3)  The correlation between a GTEM and an OATS must be performed with a
device of the type for which you wish to qualify the GTEM.  The OATS must
comply with the requirements of ANSI C63.4 and the correlation measurements
must be performed per C63.4.  The same measuring instruments should ( but is
not necessary )be used at both test locations.

If anyone has "done the math" and the setups for such testing , would you
pls contact me or point me in the direction where I could possibly "educate"
myself.

Regards,

Reg Henry


 <<Reginald Henry (E-mail 2).vcf>> 

Title: Step by Step procedure for calculating and performing Data Correl ation

All,

I am working with a GTEM Cell and wish to perform self verification of our
Class A products. We have going to an outside testing house for FCC
verification and wish now to do our own verification.

*********************************************************************
WHAT I AM LOOKING FOR IS THE....

Step by Step procedure for calculating and performing Data
Correlation between a GTEM Cell and OATS !

**************************************************************

In researching what has to be done to accomplish this task, I have gathered
the following information...

1)I Do NOT have to submit the correlated data to the FCC


2) The test does require that we do three ( 3 )  "separate" setups and break
down when we start to collect data.

3)  The correlation between a GTEM and an OATS must be performed with a
device of the type for which you wish to qualify the GTEM.  The OATS must
comply with the requirements of ANSI C63.4 and the correlation measurements
must be performed per C63.4.  The same measuring instruments should ( but is
not necessary )be used at both test locations.

If anyone has "done the math" and the setups for such testing , would you
pls contact me or point me in the direction where I could possibly "educate"
myself.

Regards,

Reg Henry