Hi Ryan,
If the national adoption of the IEC standard contains modifications, you need a 
CB report that approves compliance with these national deviations. According to 
the Australian Standards website, IEC 60320-1 has been adopted there with 
national modifications (AS/NZS 60320.1-2012 - Standards 
Australia<https://www.standards.org.au/standards-catalogue/sa-snz/electrotechnology/el-004/as-slash-nzs--60320-dot-1-2012>).
 Unfortunately, I do not have the AS/NZS edition of this standard and do not 
know the content of these modifications. Sometimes, such modifications are 
mentioned in the international IEC edition: For example, IEC 60335-1:2020 
mentions in the foreword that 0,5 mm² supply cords are not allowed for class I 
appliances in Australia and New Zealand. My experience with national deviations 
in other AS/NZS standard has been that such modifications may be only editorial 
(e.g. replacing references to other IEC standards by reference to AS/NZS 
standards which in turn are equivalent or identical to their IEC counterpart), 
but sometimes also technical (e.g. specific requirements for supply voltage and 
frequency to be used for testing).
Therefore, you should request evidence from your appliance inlet supplier that 
the inlet complies with AS/NZS 60320.1. Alternatively, you (or your supplier) 
could purchase a copy of the AS/NZS edition: If the national deviations are not 
relevant for your inlet, you may try to convince your local NRTL to accept your 
plug as compliant with AS/NZS 60320.1.
Kind regards,
Bernd

Von: Ryan Jazz <rjayasin...@yamahaguitargroup.com>
Gesendet: Montag, 17. April 2023 22:36
An: EMC-PSTC@LISTSERV.IEEE.ORG
Betreff: [PSES] Are Australia/New Zealand approvals needed for IEC 60320 
Appliance Inlet ?

[EXTERNAL E-MAIL] This email originated from outside of the organization. Do 
not click links or open attachments unless you recognize the sender.
Dear list members,
We are trying to get a CB Report for our guitar amplifier from our local NRTL.
For the Australia/New Zealand deviations they are asking us to provide an 
‘Australia/NZ’ approval document for the appliance inlet.
Is this a new requirement, I always thought Australia/New Zealand accepts IEC 
approvals.
If it is a new requirement does anyone know the regulation name or standard 
number.
Thank you,
Sincerely,
Ryan Jazz
Ryan Jayasinghe
Regulatory Compliance Engineer
rjayasin...@line6.com<mailto:rjayasin...@line6.com>

"After silence, that which best expresses the inexpressible, is music" - Aldous 
Huxley

LINE6
26580 Agoura Road
Calabasas CA 91302
line6.com
ampeg.com

-
----------------------------------------------------------------

This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<emc-p...@ieee.org<mailto:emc-p...@ieee.org>>

All emc-pstc postings are archived and searchable on the web at: 
http://www.ieee-pses.org/emc-pstc.html

Website: http://www.ieee-pses.org/
Instructions: http://www.ieee-pses.org/list.html (including how to 
unsubscribe)<http://www.ieee-pses.org/list.html>
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Mike Cantwell <mcantw...@ieee.org<mailto:mcantw...@ieee.org>>

For policy questions, send mail to:
Jim Bacher <j.bac...@ieee.org<mailto:j.bac...@ieee.org>>
David Heald <dhe...@gmail.com<mailto:dhe...@gmail.com>>

________________________________

To unsubscribe from the EMC-PSTC list, click the following link: 
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1

________________________________

WILO SE
Wilopark 1, 44263 Dortmund
Amtsgericht Dortmund, HRB 21356
www.wilo.com

Vorstand/Executive Board:
Oliver Hermes (President & CEO), Dr. Patrick Niehr, Georg Weber, Mathias Weyers
Aufsichtsratsvorsitzender/Chairman of the Supervisory Board:
Lars Roßner

Dieses Dokument ist vertraulich zu behandeln. Die Weitergabe sowie 
Vervielfaeltigung, Verwertung und Mitteilung seines Inhalts ist nur mit unserer 
ausdruecklichen Genehmigung gestattet. Alle Rechte vorbehalten, insbesondere 
fuer den Fall der Schutzrechtsanmeldung.
This document has to be treated confidentially. Its contents are not to be 
passed on, duplicated, exploited or disclosed without our expressed permission. 
All rights reserved, especially the right to apply for protective rights.

Datenschutz ist uns wichtig! Daher gehen wir sorgsam mit Ihren Daten um. 
Näheres finden Sie in unseren 
Datenschutzhinweisen<https://wilo.com/de/de/Wilo-Deutschland/Datenschutzhinweise.html>.
 Sollten Sie keinen Kontakt mehr mit uns wünschen, wenden Sie sich bitte an 
datensch...@wilo.com<mailto:datensch...@wilo.com>.
Data Protection is important to us! Therefore we handle your data carefully. 
Please find the details in our Note on Data 
Protection<https://wilo.com/de/de/Note-on-data-protection.html>. If you do not 
wish to stay in touch with us anymore, please write to 
data-priv...@wilo.com<mailto:data-priv...@wilo.com>.

-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<emc-p...@ieee.org>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Website:  http://www.ieee-pses.org/
Instructions:  http://www.ieee-pses.org/list.html (including how to unsubscribe)
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Mike Cantwell <mcantw...@ieee.org>

For policy questions, send mail to:
Jim Bacher:  <j.bac...@ieee.org>
David Heald: <dhe...@gmail.com>
_________________________________________________
To unsubscribe from the EMC-PSTC list, click the following link: 
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1

Reply via email to