On Fri, 9 Nov 2012 16:00:42 -0600, you wrote:
I think there may be some confusion here. No one is saying that Tx causes or
should cause tools to change on a milling machine. This is lathe behavior
only.
Correct.
Most common on commercial mills I've had dealing with, Txx pre selects
the
On VMC's with a tool carrousel, usually the T call positions the carrousel
to the correct tool number, then M6 executes
the sub programs to position the Z axis, and the proper ladder sequence to
operate the tool arm, retention stud, etc. I am not sure how or when the
offsets are loaded into the
On Fri, Nov 09, 2012 at 04:05:36PM -0500, kliegelmach...@gmail.com wrote:
On VMC's with a tool carrousel, usually the T call positions the carrousel
to the correct tool number, then M6 executes
the sub programs to position the Z axis, and the proper ladder sequence to
operate the tool arm,
http://www.youtube.com/watch?v=39q6kvrSBSk
On 11/9/2012 3:05 PM, kliegelmach...@gmail.com wrote:
On VMC's with a tool carrousel, usually the T call positions the carrousel
to the correct tool number, then M6 executes
the sub programs to position the Z axis, and the proper ladder sequence to
:06 PM
To: emc-users@lists.sourceforge.net
Subject: [Emc-users] ubject: Re: Fanuc tool changes - was Ideal Tool Table To:
Enhanced Machine Controller (EMC)
On VMC's with a tool carrousel, usually the T call positions the carrousel
to the correct tool number, then M6 executes
the sub programs