On Wed, Apr 9, 2008 at 6:38 AM, Jose Gonzalez [EMAIL PROTECTED] wrote:
Cedric wrote:
Let's really break everything ! This is the same serie of old patch
up to date that improve the cache system. It should not break
anything. The code is cleaner and should fix some bugs hard to track
On Tue, 8 Apr 2008 17:40:10 -0400 (EDT) Enlightenment CVS
[EMAIL PROTECTED] wrote:
Enlightenment CVS committal
Author : davemds
Project : e_modules
Module : forecasts
Dir : e_modules/forecasts
Modified Files:
e-module-forecasts.edj
Log Message:
recompiled edj as
On Tue, Apr 8, 2008 at 7:02 PM, Gustavo Sverzut Barbieri
[EMAIL PROTECTED] wrote:
On Tue, Apr 8, 2008 at 11:05 AM, Cedric BAIL [EMAIL PROTECTED] wrote:
Hi,
This patch doesn't break anything at this time :-) It's a
standalone feature that just add the possibility to evas to receive
Build log for Enlightenment DR 0.17 on 2008-04-09 07:09:13 -0700
Build logs are available at http://download.enlightenment.org/tests/logs
Packages that failed to build:
ecore_li http://download.enlightenment.org/tests/logs/ecore_li.log
engage
David Seikel wrote:
On Tue, 8 Apr 2008 17:40:10 -0400 (EDT) Enlightenment CVS
[EMAIL PROTECTED] wrote:
Enlightenment CVS committal
Author : davemds
Project : e_modules
Module : forecasts
Dir : e_modules/forecasts
Modified Files:
e-module-forecasts.edj
Log Message:
- David Seikel [EMAIL PROTECTED] ha scritto:
On Tue, 8 Apr 2008 17:40:10 -0400 (EDT) Enlightenment CVS
[EMAIL PROTECTED] wrote:
Enlightenment CVS committal
Author : davemds
Project : e_modules
Module : forecasts
Dir : e_modules/forecasts
Modified Files:
Cedric wrote:
That's a pretty hefty patch. :) Do you think you could write
down some of the design/structure/etc, and what you're aiming for
here.. for the sake of posterity and mere mortals with little time
to look it all over. :)
Yes of course. So it's basically an