Hi,
Master branch is open now for 4.10RC2 contributions. Post RC2 all 4.10
contributions(if needed) should go to R4_10_maintenance.
Master will be opened for 4.11 contributions once the preparatory work for
building 4.11 is complete like making sure we have at least one build and
Correction: December 6th is not only Bug verification day, but also “1-day
test pass against RC2 and sign-off”
Regards,
Kalyan
From: Kalyan P Tatavarthi
Sent: Friday, November 30, 2018 4:41 PM
To: Eclipse platform release engineering list.
; General development mailing list of the
Master branch will be opened for 4.11 contribution once the preparation work is
complete. Till that time master branch will be closed
Thanks and Regards,
Sravan
Sravan Kumar Lakkimsetti
IBM India Pvt Ltd,
Embassy Golf Links Business Park, D Block,
Off Indiranagar-Kormangla Inner Ring
Hi all,
We have 4.10 RC2 scheduled on Dec 7, 2018. Please refer to the freeze
plan:
http://www.eclipse.org/eclipse/development/plans/freeze_plan_4_10.php
Here is the schedule:
Dec 5, 2018, 6pm EST
Wednesday
Release Candidate 2 build
Dec 6, 2018
Thursday
Bug verification and Sign-off
We are pleased to announce that 2018-12 RC1 is available for download and
updates.
Eclipse downloads:
http://download.eclipse.org/eclipse/downloads/drops4/S-4.10RC1-20181129033
0/
Update existing (non-production) installs: