When following the Ed Crowley server move method, 6c, do I just have to
CHANGE the Replication bridgehead server in the existing Directory
Replication Connector, even if the old server is to be removed later on? The
Directory Replication Connector doesn´t have to be installed on the new
server?

Best regarde
Magnus Ramnell

_________________________________________________________________
List posting FAQ:       http://www.swinc.com/resource/exch_faq.htm
Archives:               http://www.swynk.com/sitesearch/search.asp
To unsubscribe:         mailto:[EMAIL PROTECTED]
Exchange List admin:    [EMAIL PROTECTED]

Reply via email to