When following the Ed Crowley server move method, 6c, do I just have to CHANGE the Replication bridgehead server in the existing Directory Replication Connector, even if the old server is to be removed later on? The Directory Replication Connector doesn´t have to be installed on the new server?
Best regarde Magnus Ramnell _________________________________________________________________ List posting FAQ: http://www.swinc.com/resource/exch_faq.htm Archives: http://www.swynk.com/sitesearch/search.asp To unsubscribe: mailto:[EMAIL PROTECTED] Exchange List admin: [EMAIL PROTECTED]