Well, like I said, my experience with Integrator 30's is limited. I just
double-checked, and all of our compounds on the MG30's are 1/0, and the
MDSCAN' s are something else. You have me stumped. Are you getting the BAD
message on the ABSCAN detail display? I know I've had to do some strange
t
[Summary:
I can't get an Integrator 30 to read from a PLC with Period 3, Phase 1.
Tim Lowell suggested that I leave the COMPOUNDS PERIOD 1 PHASE 0 and then
phase the ABSCAN and following blocks to reduce station loading. ]
Tim,
I did attempt to use a PERIOD 1 PHASE 0 on the compound, and t
David, I also think that you should leave the compound Per/Ph at 1/0. On
all our AB Int 30's we are doing the same type of phasing you describe,
except we have not touched the compound.
---
This list is neither sponsored nor
David,
Based on my limited experience with Integrator 30's, I would recommend not
phasing the compounds. Leave them all at PERIOD 1, PHASE 0. I would phase
the ABSCAN's, and then phase each block under each ABSCAN with the same
PERIOD and PHASE as its corresponding ABSCAN. This should be allow
I have had some strange results recently when trying to phase some
compounds in an AB Integrator 30.
Here are the particulars.
The Integrator is running with a Base Processing Cycle (BPC) of 1 second.
Most of the existing COMPOUNDS are running with a PERIOD 1 PHASE 0.
(That should be e