On Gio, 28 Ottobre 2010 7:23 pm, Dmitri Pal wrote:
> Next alpha is brewing as we are speaking. Realistically it should be
> ready next week.
> Final is at least December - January. Beta might be somewhere in the
> middle like early December...
>
That's interesting ;-)
--
Andrea Modesto Rossi
Fed
On Thu, Oct 28, 2010 at 7:23 PM, Dmitri Pal wrote:
> Hemminger, Corey Lee. [heco0...@stcloudstate.edu] wrote:
>> Is their a rough estimate when the next version 2.0 prealpha 5 or V2.0 Final
>> will be out?
> Next alpha is brewing as we are speaking. Realistically it should be
> ready next week.
Hi all
while trying the latest nightly build of IPAv2 I noticed the integrated
certification authority is installed in a second 389DS instance, so a
full IPAv2 server would have (at least) two 389DS instances running.
Why is it installed that way, instead of simply adding another suffix in
the m
Loris Santamaria wrote:
> Hi all
>
> while trying the latest nightly build of IPAv2 I noticed the integrated
> certification authority is installed in a second 389DS instance, so a
> full IPAv2 server would have (at least) two 389DS instances running.
>
> Why is it installed that way, instead of s
Loris Santamaria wrote:
Hi all
while trying the latest nightly build of IPAv2 I noticed the integrated
certification authority is installed in a second 389DS instance, so a
full IPAv2 server would have (at least) two 389DS instances running.
Why is it installed that way, instead of simply add