[FRIAM] A modest proposal

2011-03-16 Thread plissaman
The two nuclear plants in CA, San Onofre and Diablo Canyon, produce about 4.5 GW together.   Both are coastline installations vulnerable to seismic and tsunami activity.   CA total electrical power plant capacity is about 33 GW .  In 2010 t otal used capacity for 100% full operation was

Re: [FRIAM] A modest proposal

2011-03-16 Thread Carl Tollander
Oranges and Apples maybe? They're different technologies (BWR vs PWR). It does not appear that any of the current issues at Fukushima originated with the basic design, but were due to loss of supporting infrastructure (e.g., loss of grid power to the pumps, the wave washed out the diesel

Re: [FRIAM] A modest proposal

2011-03-16 Thread Tom Johnson
And lotsaluck in getting PGE -- the power company -- to pay for the decomissioning. -tj On Wed, Mar 16, 2011 at 1:11 PM, plissa...@comcast.net wrote: The two nuclear plants in CA, San Onofre and Diablo Canyon, produce about 4.5 GW together. Both are coastline installations vulnerable to