On 06/21/2016 09:50 AM, James Greenhalgh wrote:
Hi,
This transformation tries two cost models, one estimating the number
of insns to use, one estimating the RTX cost of the transformed sequence.
This is inconsistent with the other cost models used in ifcvt.c and
unneccesary - eliminate the
Hi,
This transformation tries two cost models, one estimating the number
of insns to use, one estimating the RTX cost of the transformed sequence.
This is inconsistent with the other cost models used in ifcvt.c and
unneccesary - eliminate the second cost model.
Thanks,
James
---
2016-06-21