Hi,
> My concern with the original dates is that as written, there is only one day
> for the podling to prepare the report.
The bulk of the report could be prepped before that date, as it unlikely in the
majority of cases and anything board worthy happened in the last couple of days
of teh mon
Hi Justin,
> On Apr 20, 2019, at 3:05 PM, Justin Mclean wrote:
>
> H,
>
> So this is the only date you want to change:
>> 1. PME + 5 days - Podling reports due by end of day
>
> My concern with that is that will it give mentors and the IPMC time to
> review and sign off?
My concern with th
Perfect. Thanks Justin, thanks Dave.
On Sat, Apr 20, 2019 at 6:00 PM Justin Mclean
wrote:
> HI,
>
> Drew you were assigned to Milagro and Pinot, was a copy paste error when
> I was trying to reformat the page.
>
> Thanks,
> Justin
>
H,
So this is the only date you want to change:
> 1. PME + 5 days - Podling reports due by end of day
My concern with that is that will it give mentors and the IPMC time to review
and sign off? Currently we get one or two reports a month that fail to get
signify and a number of podling do t
HI,
Drew you were assigned to Milagro and Pinot, was a copy paste error when I was
trying to reformat the page.
Thanks,
Justin
-
To unsubscribe, e-mail: general-unsubscr...@incubator.apache.org
For additional commands, e-mail:
Hi Drew,
For some reason I was given four to shepherd and should never get more than two.
Please take two from me.
Regards,
Dave
Sent from my iPhone
> On Apr 20, 2019, at 12:02 PM, Drew Farris wrote:
>
> Hi All,
>
> I noticed that I fell off the shepherds list for May. Did something change
Hi All,
I noticed that I fell off the shepherds list for May. Did something change
with the way shepherds are assigned after the report moved to Confluence?
Thanks,
Drew
On Thu, Apr 18, 2019 at 9:54 PM Justin Mclean
wrote:
> Hi,
>
> Report timeline for May:
> Wed May 01 -Podling reports due b
My points are:
1. mentor review and sign-off steps are part of the podling's reporting
step, and
2. give podlings to start their step after the end of the period,
instead of before the end it
The suggestion I made earlier provides 2, while at the same time giving
shepherds and I-PMC a
Hi,
This doesn’t seem to change the dates tat much and I’m not sure exactly what
issue you are trying to solve here, can you give some more details?
The board meeting is a fixed date and everything works backwards from that to
give everyone enough time t do what they need to do.
Thanks,
Justin
The schedule is intended to be about reporting the the month/quarter prior
to the reporting month by codlings, however the podling part is, albeit a
quite important step, not very well catered for. The schedule focuses on
mentor (as if they were outside of the podlings community) and Incubators
PM
Hi, Justin,
Me too.
After I login it with my apache id, I found that I have no permission.
Any process I need to go through?
Thanks
在 2019/4/19 上午10:34,“Ovilia” 写入:
Hi Justin,
I found I don't have the access to
https://cwiki.apache.org/confluence/display/INCUBATOR/May2019 after log
Hi,
> I found I don't have the access to
> https://cwiki.apache.org/confluence/display/INCUBATOR/May2019 after login in.
I given fermions to the entire space for the “incubator” group (although I’m
not 100% of the people in that or where to check I assume LDAP?) , can you try
again and see if t
Hi Justin,
I found I don't have the access to
https://cwiki.apache.org/confluence/display/INCUBATOR/May2019 after login
in.
Should I open a jira ticket or perhaps you could do the help?
My id is Ovilia and email is oviliazh...@gmail.com.
Thanks!
Zhang Wenli
http://zhangwenli.com
Justin Mclean
Hi,
Report timeline for May:
Wed May 01 -Podling reports due by end of day
Sun May 05 - Shepherd reviews due by end of day
Sun May 05 - Summary due by end of day
Tue May 07 - |Mentor signoff due by end of day
Wed May 08 - Report submitted to Board
Wed May 15 - Board meeting
Podlings expect
14 matches