>From this weeks BSR:
For Feature Complete (Aug. 30)
Test Complete (Sep. 15)
For Code Freeze (Oct 2)
Testing of Release Candidate 1 (Oct 5- Oct 20 )
Stage Release (Oct. 25)
Release Day (Oct. 31)
I created JIRA milestones for 4 of these:
[cid:image001.png@01D487EB.D5B796B0]
The most recent test system results (Red Hat).
- DJC
--
Darrel J. Conway, Ph.D. Thinking Systems, Inc.
Senior Scientist and CEO 6441 N Camino Libby
Phone: (623) 298-4530Tucson, AZ 85718
FAX: (520) 232-2533www.thinksysinc.com
Cell: (520) 425-3626
Most recent test results (Ubuntu).
- DJC
--
Darrel J. Conway, Ph.D. Thinking Systems, Inc.
Senior Scientist and CEO 6441 N Camino Libby
Phone: (623) 298-4530Tucson, AZ 85718
FAX: (520) 232-2533www.thinksysinc.com
Cell: (520) 425-3626d...@thinksysinc.com
-
Summary
-
System configuration: Windows 10/MATLAB R2017a/VS 2013
Tested build: 2018-11-28
Regression build: 2018-11-27
Total number of scripts: 14016 (+83 deferred)