[Gmat-buildtest] Test results: 2018-04-09 (Catsclaw/RHEL-Linux/GmatConsole-64/M2017b/GCC4.8.5)

2018-04-16 Thread Darrel Conway
Most recent test system results (Red Hat). These results are the reverted R2018a code, with the updates committed through Friday. In other words, it *might* be RC3 code -- are we waiting for anything else for the release candidate? - DJC -- Darrel J. Conway, Ph.D. Thinking Systems, Inc

[Gmat-buildtest] Test results: 2018-04-16 (Houndstooth/Ubuntu-Linux/GmatConsole-64/M2017b/GCC5.4.0)

2018-04-16 Thread Darrel Conway
Most recent test results (Ubuntu). These results are the reverted R2018a code, with the updates committed through Friday. In other words, it *might* be RC3 code -- are we waiting for anything else for the release candidate? - DJC -- Darrel J. Conway, Ph.D. Thinking Systems, Inc. Senior