Hi,
I have a notebook with T7200 Intel CPU and r.sun completes one day's
calculation between 3-4 mins(with linke turbidity raster and shadowing, step
= 1). I want to run r.sun with step=0.5 in a large scale and detailed area.
So, I need to reduce the calculation time for calculating 365 day data.
buraq wrote:
I have a notebook with T7200 Intel CPU and r.sun completes
one day's calculation between 3-4 mins(with linke turbidity raster
and shadowing, step = 1). I want to run r.sun with step=0.5 in a
large scale and detailed area.
So, I need to reduce the calculation time for calculating
On Tuesday 30 June 2009, Hamish wrote:
buraq wrote:
I have a notebook with T7200 Intel CPU and r.sun completes
one day's calculation between 3-4 mins(with linke turbidity raster
and shadowing, step = 1). I want to run r.sun with step=0.5 in a
large scale and detailed area.
So, I need to