Eric Payne created HDFS-14758:
---------------------------------

             Summary: Decrease lease hard limit
                 Key: HDFS-14758
                 URL: https://issues.apache.org/jira/browse/HDFS-14758
             Project: Hadoop HDFS
          Issue Type: Improvement
            Reporter: Eric Payne


The hard limit is currently hard-coded to be 1 hour. This also determines the 
NN automatic lease recovery interval. Something like 20 min will make more 
sense.

After the 5 min soft limit, other clients can recover the lease. If no one else 
takes the lease away, the original client still can renew the lease within the 
hard limit. So even after a NN full GC of 8 minutes, leases can be still valid.

However, there is one risk in reducing the hard limit. E.g. Reduced to 20 min. 
If the NN crashes and the manual failover takes more than 20 minutes, clients 
will abort.



--
This message was sent by Atlassian Jira
(v8.3.2#803003)

---------------------------------------------------------------------
To unsubscribe, e-mail: hdfs-dev-unsubscr...@hadoop.apache.org
For additional commands, e-mail: hdfs-dev-h...@hadoop.apache.org

Reply via email to